Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete pump pipe fixing structure for super high-rise building construction
The invention relates to a concrete pump pipe fixing structure for super high-rise building construction, and belongs to the technical field of building construction. The concrete pump pipe fixing structure comprises a square frame, the square frame comprises a first rod body and a second rod body, a connecting rod is arranged between the first rod body and the second rod body, a plurality of sliding rods penetrate through the first rod body and are in sliding connection with the first rod body, arc plates are arranged at the ends, close to the second rod body, of the sliding rods, connectingplates are arranged at the ends, away from the second rod body, of the sliding rods, first springs are arranged between the connecting plates and the first rod body, one ends of the first springs areconnected to the connecting plates, the other ends of the first springs are connected to the first rod body, the first springs sleeve on the first rod body, a pump pipe can be fixed by resisting the elastic force of the first springs to drive the arc plates to move, the fixing mode is convenient and simple, and the installation efficiency of installation personnel is improved.
本发明涉及一种超高层建筑施工混凝土泵管固定结构,属于建筑施工技术领域,包括方框,方框包括第一杆体和第二杆体,第一杆体和第二杆体之间设置有连接杆,第一杆体上穿设且滑动连接有多个滑动杆,滑动杆靠近第二杆体的端部设置有圆弧板,滑动杆远离第二杆体的端部设置有连接板,连接板与第一杆体之间设置有第一弹簧,第一弹簧的一端连接至连接板上,另一端连接至第一杆体上,第一弹簧套设于第一杆体上,通过抵抗第一弹簧的弹力带动圆弧板移动即可完成对泵管的固定,固定方式方便简单,提高了安装人员的安装效率。
Concrete pump pipe fixing structure for super high-rise building construction
The invention relates to a concrete pump pipe fixing structure for super high-rise building construction, and belongs to the technical field of building construction. The concrete pump pipe fixing structure comprises a square frame, the square frame comprises a first rod body and a second rod body, a connecting rod is arranged between the first rod body and the second rod body, a plurality of sliding rods penetrate through the first rod body and are in sliding connection with the first rod body, arc plates are arranged at the ends, close to the second rod body, of the sliding rods, connectingplates are arranged at the ends, away from the second rod body, of the sliding rods, first springs are arranged between the connecting plates and the first rod body, one ends of the first springs areconnected to the connecting plates, the other ends of the first springs are connected to the first rod body, the first springs sleeve on the first rod body, a pump pipe can be fixed by resisting the elastic force of the first springs to drive the arc plates to move, the fixing mode is convenient and simple, and the installation efficiency of installation personnel is improved.
本发明涉及一种超高层建筑施工混凝土泵管固定结构,属于建筑施工技术领域,包括方框,方框包括第一杆体和第二杆体,第一杆体和第二杆体之间设置有连接杆,第一杆体上穿设且滑动连接有多个滑动杆,滑动杆靠近第二杆体的端部设置有圆弧板,滑动杆远离第二杆体的端部设置有连接板,连接板与第一杆体之间设置有第一弹簧,第一弹簧的一端连接至连接板上,另一端连接至第一杆体上,第一弹簧套设于第一杆体上,通过抵抗第一弹簧的弹力带动圆弧板移动即可完成对泵管的固定,固定方式方便简单,提高了安装人员的安装效率。
Concrete pump pipe fixing structure for super high-rise building construction
超高层建筑施工混凝土泵管固定结构
HU LISHENG (Autor:in) / CAO LANG (Autor:in) / DING LIHUA (Autor:in) / LI BING (Autor:in) / DONG WANJUN (Autor:in) / DENG XIAOQIU (Autor:in) / WANG DONGGEN (Autor:in) / XU YANG (Autor:in) / FU HAILONG (Autor:in) / LI XIANG (Autor:in)
09.06.2020
Patent
Elektronische Ressource
Chinesisch
Concrete pump pipe fixing structure for super high-rise building construction
Europäisches Patentamt | 2022
|Bridge construction concrete pump pipe fixing structure
Europäisches Patentamt | 2023
|Large circular steel pipe concrete column for super high-rise building structure
Europäisches Patentamt | 2020
|Anti-cracking high-rise building concrete pouring pump pipe system
Europäisches Patentamt | 2024
|