Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building construction water supply and drainage engineering construction method
The invention relates to a building construction water supply and drainage engineering construction method. A moving device, a first tamping device and a second tamping device are included. The firsttamping device is mounted at the upper end of the moving device, the second tamping device is mounted at the rear end of the first tamping device, and the second tamping device comprises a second supporting plate, a second electric telescopic rod, a C-shaped frame, a cleaning frame and a cylindrical frame. Equipment is positioned through the moving device, so that the purpose of balancing force borne by the equipment is achieved; the first tamping device is used for tamping the bottom of a groove and the wall of the groove, so that the purpose of completely tamping the groove is achieved; thebottom of the groove is tamped again through the second tamping device; cylindrical springs and arc-shaped plates cooperate to tamp the bottom of the groove; and the bottom of the groove is completelytamped through arc-shaped long plates with different lengths, so that incomplete tamping caused by the fact that the contact area is too large is avoided, and the cylindrical frame is cleaned.
本发明涉及一种建筑建造给排水工程施工方法,包括运动装置、夯实装置一与夯实装置二,运动装置上端安装有夯实装置一,夯实装置一后端安装有夯实装置二,所述夯实装置二包括支撑板二、电动伸缩杆二、C形架、清洁架与圆柱架,本发明通过运动装置对设备进行定位,以达到平衡设备受力的目的,通过夯实装置一对沟槽底部以及沟槽槽壁进行夯实,以达到完全夯实沟槽的目的,通过夯实装置二对沟槽底部再次进行夯实,通过圆柱弹簧与弧形板相配合对沟槽底部进行夯实,通过长度不同的弧形长板对沟槽底部进行完全夯实,以防止由于接触面积过大导致夯实不完全,并对圆柱架进行清理。
Building construction water supply and drainage engineering construction method
The invention relates to a building construction water supply and drainage engineering construction method. A moving device, a first tamping device and a second tamping device are included. The firsttamping device is mounted at the upper end of the moving device, the second tamping device is mounted at the rear end of the first tamping device, and the second tamping device comprises a second supporting plate, a second electric telescopic rod, a C-shaped frame, a cleaning frame and a cylindrical frame. Equipment is positioned through the moving device, so that the purpose of balancing force borne by the equipment is achieved; the first tamping device is used for tamping the bottom of a groove and the wall of the groove, so that the purpose of completely tamping the groove is achieved; thebottom of the groove is tamped again through the second tamping device; cylindrical springs and arc-shaped plates cooperate to tamp the bottom of the groove; and the bottom of the groove is completelytamped through arc-shaped long plates with different lengths, so that incomplete tamping caused by the fact that the contact area is too large is avoided, and the cylindrical frame is cleaned.
本发明涉及一种建筑建造给排水工程施工方法,包括运动装置、夯实装置一与夯实装置二,运动装置上端安装有夯实装置一,夯实装置一后端安装有夯实装置二,所述夯实装置二包括支撑板二、电动伸缩杆二、C形架、清洁架与圆柱架,本发明通过运动装置对设备进行定位,以达到平衡设备受力的目的,通过夯实装置一对沟槽底部以及沟槽槽壁进行夯实,以达到完全夯实沟槽的目的,通过夯实装置二对沟槽底部再次进行夯实,通过圆柱弹簧与弧形板相配合对沟槽底部进行夯实,通过长度不同的弧形长板对沟槽底部进行完全夯实,以防止由于接触面积过大导致夯实不完全,并对圆柱架进行清理。
Building construction water supply and drainage engineering construction method
一种建筑建造给排水工程施工方法
GUO QINGYE ( Autor:in ) / ZHU YOUXIN ( Autor:in )
23.06.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|Water supply and drainage device for building engineering construction
Europäisches Patentamt | 2024
|Building construction water supply and drainage project construction method
Europäisches Patentamt | 2023
|Construction device and construction process for building water supply and drainage engineering
Europäisches Patentamt | 2024
|Building water supply and drainage project construction method
Europäisches Patentamt | 2024
|