The invention discloses a prefabricated column cast-in-place connecting joint formwork. The prefabricated column cast-in-place connecting joint formwork comprises a fixed end formwork and a connectingsection side formwork. According to the prefabricated column cast-in-place connecting joint formwork, the redundant part is removed through an inserting plate on a fixed opening formwork after concrete pouring of a prefabricated column cast-in-place connecting section is completed, so that normal pouring of the prefabricated column cast-in-place connecting section is realized, the situation thata horn mouth is reserved due to the fact that pouring of the cast-in-place section is guaranteed, and the redundant part needs to be chiseled away in the later period is avoided, construction of the cast-in-place connecting section of a prefabricated column is facilitated, and the construction efficiency is improved; the formwork is formed by adopting modular design, so that machining and manufacturing in a factory are convenient, and different modulus sections can be machined conveniently; and meanwhile, on-site assembly is more convenient, time and labor are saved, the requirements of formworks of connecting sections with different lengths are met, and use is convenient and rapid; and in addition, redundant concrete in a pouring opening is separated before initial setting of the concreteand then is used for concrete pouring of other parts, so that the concrete consumption is effectively saved, the construction cost is reduced, and the construction cost is reduced.
本发明公开一种预制柱现浇连接节点模板,包括固定端模和连接段侧模;本发明通过固定开口模板上的插板将预制柱现浇连接段混凝土浇筑完成后多余部分剔除,从而实现预制柱现浇连接段的正常浇筑,避免因保证现浇段浇筑而余留喇叭口,造成后期还要将多余部分凿除,方便预制构柱的现浇连接段施工,从而提高了施工效率,同时,通过采用模块化设计组成模板,使工厂加工制作方便,便于加工不同模数分段,同时使现场组装更加便捷,省时省力,并满足不同长度连接段的模板要求,使用方便快捷,另外,通过在混凝土初凝前将浇筑口内多余混凝土分离后用于其他部位混凝土浇筑,有效节约了混凝土用量和降低工程造价,从而降低了施工成本。
The invention discloses a prefabricated column cast-in-place connecting joint formwork. The prefabricated column cast-in-place connecting joint formwork comprises a fixed end formwork and a connectingsection side formwork. According to the prefabricated column cast-in-place connecting joint formwork, the redundant part is removed through an inserting plate on a fixed opening formwork after concrete pouring of a prefabricated column cast-in-place connecting section is completed, so that normal pouring of the prefabricated column cast-in-place connecting section is realized, the situation thata horn mouth is reserved due to the fact that pouring of the cast-in-place section is guaranteed, and the redundant part needs to be chiseled away in the later period is avoided, construction of the cast-in-place connecting section of a prefabricated column is facilitated, and the construction efficiency is improved; the formwork is formed by adopting modular design, so that machining and manufacturing in a factory are convenient, and different modulus sections can be machined conveniently; and meanwhile, on-site assembly is more convenient, time and labor are saved, the requirements of formworks of connecting sections with different lengths are met, and use is convenient and rapid; and in addition, redundant concrete in a pouring opening is separated before initial setting of the concreteand then is used for concrete pouring of other parts, so that the concrete consumption is effectively saved, the construction cost is reduced, and the construction cost is reduced.
本发明公开一种预制柱现浇连接节点模板,包括固定端模和连接段侧模;本发明通过固定开口模板上的插板将预制柱现浇连接段混凝土浇筑完成后多余部分剔除,从而实现预制柱现浇连接段的正常浇筑,避免因保证现浇段浇筑而余留喇叭口,造成后期还要将多余部分凿除,方便预制构柱的现浇连接段施工,从而提高了施工效率,同时,通过采用模块化设计组成模板,使工厂加工制作方便,便于加工不同模数分段,同时使现场组装更加便捷,省时省力,并满足不同长度连接段的模板要求,使用方便快捷,另外,通过在混凝土初凝前将浇筑口内多余混凝土分离后用于其他部位混凝土浇筑,有效节约了混凝土用量和降低工程造价,从而降低了施工成本。
Formwork of prefabricated column connecting joint and joint construction method using formwork
Europäisches Patentamt | 2022
|Prefabricated bridge deck formwork-free cast-in-place wet joint structure
Europäisches Patentamt | 2021
|Prefabricated column and cast-in-place beam connecting joint structure and construction method
Europäisches Patentamt | 2024
|Prefabricated shear wall cast-in-place section shaping formwork
Europäisches Patentamt | 2023
|Beam-column joint integrated cast-in-place formwork construction method
Europäisches Patentamt | 2023
|