Method for removing floor formwork through preset steel sheet
The invention relates to the technical field of roof formwork removal, and particularly relates to a method for removing a floor formwork through a preset steel sheet. The method comprises the following steps that 1) the long edge of the L-shaped steel sheet (1) is pre-buried in the formwork; 2) the L-shaped steel sheet is fixed to the formwork through iron nail holes by means of iron nails; and 3) after the formwork is used and needs to be removed, the formwork is pried through a pry bar hole by means of a pry bar. According to the method, the formwork removal time is saved, destructive formwork removal is avoided, the service life of the formwork is prolonged, the turnover frequency of the formwork is increased, and the method is mainly used for the field of roof formwork removal.
本发明涉及楼顶模板拆除技术领域,更具体而言,涉及一种预设钢片拆除楼板模板的方法,其步骤如下:1)将L型钢片(1)的长边预埋到模板中;2)利用铁钉通过铁钉孔将所述L型钢片固定到模板上;3)待模板使用完成,需要拆卸时,利用撬杆通过所述撬杆孔将模板撬开。本发明节约了拆模时间、避免破坏性拆模、提高了模板的寿命和周转次数,本发明主要用于楼顶模板拆除领域。
Method for removing floor formwork through preset steel sheet
The invention relates to the technical field of roof formwork removal, and particularly relates to a method for removing a floor formwork through a preset steel sheet. The method comprises the following steps that 1) the long edge of the L-shaped steel sheet (1) is pre-buried in the formwork; 2) the L-shaped steel sheet is fixed to the formwork through iron nail holes by means of iron nails; and 3) after the formwork is used and needs to be removed, the formwork is pried through a pry bar hole by means of a pry bar. According to the method, the formwork removal time is saved, destructive formwork removal is avoided, the service life of the formwork is prolonged, the turnover frequency of the formwork is increased, and the method is mainly used for the field of roof formwork removal.
本发明涉及楼顶模板拆除技术领域,更具体而言,涉及一种预设钢片拆除楼板模板的方法,其步骤如下:1)将L型钢片(1)的长边预埋到模板中;2)利用铁钉通过铁钉孔将所述L型钢片固定到模板上;3)待模板使用完成,需要拆卸时,利用撬杆通过所述撬杆孔将模板撬开。本发明节约了拆模时间、避免破坏性拆模、提高了模板的寿命和周转次数,本发明主要用于楼顶模板拆除领域。
Method for removing floor formwork through preset steel sheet
一种预设钢片拆除楼板模板的方法
LI CHUNHONG (Autor:in) / WANG DONGLIANG (Autor:in) / ZHANG JUNSHENG (Autor:in) / ZHAO TINGSHUAI (Autor:in) / WANG XIAODONG (Autor:in) / WANG YONGGANG (Autor:in) / ZHANG ERFENG (Autor:in) / YANG YONGLI (Autor:in)
26.06.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Light preset assembly type space net rack ribbed floor formwork and construction process
Europäisches Patentamt | 2021
|Floor formwork removing device for building construction
Europäisches Patentamt | 2024
|Floor formwork free of wood brace and construction method of floor formwork
Europäisches Patentamt | 2022
|Fabricated steel structure floor formwork supporting frame
Europäisches Patentamt | 2022
|