Cast-in-place box girder support construction process
The invention discloses a cast-in-place box girder support construction process, and belongs to the field of bridge construction. The process comprises the following steps: S1, processing a foundation; S2, assembling a frame body; S3, mounting a formwork: arranging an adjustable bracket at the top end of a vertical rod, and arranging a plate supporting assembly and a bottom formwork on the adjustable bracket; S4, pre-pressing load: laying a plurality of pre-pressing pieces on the bottom formwork, and pre-pressing the frame body by the total weight of the pre-pressing pieces according to 120% of the self weight of the box girder; S5, adjusting the bottom formwork: after pre-pressing is completed, adjusting the elevation, the pre-camber and the transverse curve of the bottom formwork throughan adjustable bracket according to pre-pressing data; and S6, pouring the box girder: bonding and molding a box girder bottom plate and web steel bars on the formwork, and conducting concrete pouring. By means of the cast-in-place box girder support construction process, the cast-in-place box girder construction quality can be improved.
本发明公开了一种现浇箱梁支架施工工艺,属于桥梁建筑领域,该工艺包括的步骤有:S1.地基处理;S2.拼装架体;S3.模板安装,在立杆顶端设置可调托座,在可调托座上设置板支撑组件及底模板;S4.预压载荷,在底模板上铺设若干预压件,预压件的总重量按箱梁自重的120%对架体进行预压;S5.底模板调整,预压完成后,对底模板的标高、预拱度及横向曲线根据预压数据通过可调托座进行调整;S6.箱梁浇筑,将箱梁底板、腹板钢筋绑扎成型在模板上,进行混凝土浇筑,利用该现浇箱梁支架施工工艺,可以提高现浇箱梁施工的质量。
Cast-in-place box girder support construction process
The invention discloses a cast-in-place box girder support construction process, and belongs to the field of bridge construction. The process comprises the following steps: S1, processing a foundation; S2, assembling a frame body; S3, mounting a formwork: arranging an adjustable bracket at the top end of a vertical rod, and arranging a plate supporting assembly and a bottom formwork on the adjustable bracket; S4, pre-pressing load: laying a plurality of pre-pressing pieces on the bottom formwork, and pre-pressing the frame body by the total weight of the pre-pressing pieces according to 120% of the self weight of the box girder; S5, adjusting the bottom formwork: after pre-pressing is completed, adjusting the elevation, the pre-camber and the transverse curve of the bottom formwork throughan adjustable bracket according to pre-pressing data; and S6, pouring the box girder: bonding and molding a box girder bottom plate and web steel bars on the formwork, and conducting concrete pouring. By means of the cast-in-place box girder support construction process, the cast-in-place box girder construction quality can be improved.
本发明公开了一种现浇箱梁支架施工工艺,属于桥梁建筑领域,该工艺包括的步骤有:S1.地基处理;S2.拼装架体;S3.模板安装,在立杆顶端设置可调托座,在可调托座上设置板支撑组件及底模板;S4.预压载荷,在底模板上铺设若干预压件,预压件的总重量按箱梁自重的120%对架体进行预压;S5.底模板调整,预压完成后,对底模板的标高、预拱度及横向曲线根据预压数据通过可调托座进行调整;S6.箱梁浇筑,将箱梁底板、腹板钢筋绑扎成型在模板上,进行混凝土浇筑,利用该现浇箱梁支架施工工艺,可以提高现浇箱梁施工的质量。
Cast-in-place box girder support construction process
现浇箱梁支架施工工艺
ZHAO WANSHAN (Autor:in) / WU JING (Autor:in) / WU XIAOQING (Autor:in) / YAO NING (Autor:in) / WANG YANLIANG (Autor:in) / DENG YINTIAN (Autor:in)
03.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Cast-in-place box girder support system and cast-in-place box girder construction method
Europäisches Patentamt | 2024
|Cast-in-place box girder support and construction method thereof
Europäisches Patentamt | 2022
|Single-span cast-in-place box girder through type cast-in-place support construction method
Europäisches Patentamt | 2024
|