On-site construction method of prefabricated corridor
The invention discloses an on-site construction method of a prefabricated corridor. The on-site construction method of the prefabricated corridor comprises the following steps: S1, taking out an outermold steel template, an outer mold steel arch frame, an inner mold steel template, an inner mold steel arch frame and two joint plates, welding the outer mold steel template and the outer mold steelarch frame through a welding machine to obtain an outer template, and welding the inner mold steel template and the inner mold steel arch frame through the welding machine to obtain an inner template.According to the construction method, through the construction mode that a dam body, the corridor and a prefabricated corridor top arch template are combined together through concrete, the rigidity is good, the later-stage dismantling is not needed, the assembly is not needed, through the arrangement of hanging ribs, the hoisting work is convenient, the manual carrying is not needed, the time andthe labor are saved, and the method has the advantages of being simple and easy to implement and easy to popularize, and has good social benefits and economic benefits.
本发明公开了一种预制廊道的现场施工方法,包括以下步骤:S1:取出外模钢模板、外模钢拱架、内模钢模板、内模钢拱架和二块接头板,将外模钢模板和外模钢拱架通过焊接机焊接得到外模板,将内模钢模板和内模钢拱架通过焊接机焊接得到内模板。本发明中通过混凝土将坝体、廊道和预制廊道顶拱模板结合在一起的施工方式,刚度良好,不需要后期的拆除,且无需组装,吊筋的设置,便于吊装工作,无需人工的搬运,省时省力,本发明具有方法简单易行,易于推广的优点,具有较好的社会效益和经济效益。
On-site construction method of prefabricated corridor
The invention discloses an on-site construction method of a prefabricated corridor. The on-site construction method of the prefabricated corridor comprises the following steps: S1, taking out an outermold steel template, an outer mold steel arch frame, an inner mold steel template, an inner mold steel arch frame and two joint plates, welding the outer mold steel template and the outer mold steelarch frame through a welding machine to obtain an outer template, and welding the inner mold steel template and the inner mold steel arch frame through the welding machine to obtain an inner template.According to the construction method, through the construction mode that a dam body, the corridor and a prefabricated corridor top arch template are combined together through concrete, the rigidity is good, the later-stage dismantling is not needed, the assembly is not needed, through the arrangement of hanging ribs, the hoisting work is convenient, the manual carrying is not needed, the time andthe labor are saved, and the method has the advantages of being simple and easy to implement and easy to popularize, and has good social benefits and economic benefits.
本发明公开了一种预制廊道的现场施工方法,包括以下步骤:S1:取出外模钢模板、外模钢拱架、内模钢模板、内模钢拱架和二块接头板,将外模钢模板和外模钢拱架通过焊接机焊接得到外模板,将内模钢模板和内模钢拱架通过焊接机焊接得到内模板。本发明中通过混凝土将坝体、廊道和预制廊道顶拱模板结合在一起的施工方式,刚度良好,不需要后期的拆除,且无需组装,吊筋的设置,便于吊装工作,无需人工的搬运,省时省力,本发明具有方法简单易行,易于推广的优点,具有较好的社会效益和经济效益。
On-site construction method of prefabricated corridor
一种预制廊道的现场施工方法
CHEN QIANG (Autor:in) / PANG QINGZHUANG (Autor:in) / GAN XIAOJIE (Autor:in) / ZHUANG GANG (Autor:in) / CHEN JIADONG (Autor:in) / ZHENG FEI (Autor:in) / LI KAIYUN (Autor:in) / FU CHENGBO (Autor:in)
03.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
Construction method of full-section prefabricated corridor under aggregate stockpiling site
Europäisches Patentamt | 2023
|Prefabricated integral dock corridor construction structure and method
Europäisches Patentamt | 2023
|Adjustable splicing type prefabricated steel structure corridor
Europäisches Patentamt | 2023
|Connecting joint of prefabricated module and corridor prefabricated plate and building structure
Europäisches Patentamt | 2022
|Box-type modular factory prefabricated steel structure corridor
Europäisches Patentamt | 2020
|