Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building facade concrete bay window board construction method
The invention relates to the technical field of bay window board building construction, in particular to a building facade concrete bay window board construction method. The method comprises the stepsof S1, performing surveying and setting out, wherein reinforcing steel bars are bound according to the design requirement; S2, erecting a formwork on an upper bay window board, and reserving lower bay window board reinforcing steel bars; S3, pouring concrete according to the design requirement for maintenance; S4, after the concrete meets the requirement for formwork disassembling, performing formwork disassembling; S5, performing secondary construction on a lower bay window board; S6, after construction of the lower bay window board is completed, performing acceptance inspection. When the body structure is constructed, the building facade upper bay window board and floors are synchronously constructed, reinforcing steel bars are reserved for the lower bay window board, and construction is performed after the formwork of the same layer is disassembled. According to the method, the construction progress can be accelerated, the quality of each procedure is effectively controlled, a project can be excellent at a time, the later maintenance cost is greatly lowered, and the pressure of the time limit for the project is relieved. The method is mainly applied to the aspect of building facade bay window board construction.
本发明涉及飘窗板建筑施工技术领域,更具体而言,涉及一种建筑外立面混凝土飘窗板施工方法。包括步骤:S1、测量放线,按设计要求绑扎钢筋;S2、对上飘窗板支设模板,预留下飘窗板钢筋;S3、按设计要求浇筑混凝土、养护;S4、混凝土达到拆模调节后,进行拆模;S5、对下飘窗板进行二次施工;S6、下飘窗板施工完毕后,进行验收。在主体结构施工时,建筑物外立面上飘窗板与楼层同步施工,下飘窗板预留钢筋,待同层模板拆除后再进行施工。该方法能加快施工进度、有效地控制每道工序的质量,做到工程一次成优,大大减少后期维修费用,减轻工期压力。本方法主要应用在建筑外立面飘窗板施工方面。
Building facade concrete bay window board construction method
The invention relates to the technical field of bay window board building construction, in particular to a building facade concrete bay window board construction method. The method comprises the stepsof S1, performing surveying and setting out, wherein reinforcing steel bars are bound according to the design requirement; S2, erecting a formwork on an upper bay window board, and reserving lower bay window board reinforcing steel bars; S3, pouring concrete according to the design requirement for maintenance; S4, after the concrete meets the requirement for formwork disassembling, performing formwork disassembling; S5, performing secondary construction on a lower bay window board; S6, after construction of the lower bay window board is completed, performing acceptance inspection. When the body structure is constructed, the building facade upper bay window board and floors are synchronously constructed, reinforcing steel bars are reserved for the lower bay window board, and construction is performed after the formwork of the same layer is disassembled. According to the method, the construction progress can be accelerated, the quality of each procedure is effectively controlled, a project can be excellent at a time, the later maintenance cost is greatly lowered, and the pressure of the time limit for the project is relieved. The method is mainly applied to the aspect of building facade bay window board construction.
本发明涉及飘窗板建筑施工技术领域,更具体而言,涉及一种建筑外立面混凝土飘窗板施工方法。包括步骤:S1、测量放线,按设计要求绑扎钢筋;S2、对上飘窗板支设模板,预留下飘窗板钢筋;S3、按设计要求浇筑混凝土、养护;S4、混凝土达到拆模调节后,进行拆模;S5、对下飘窗板进行二次施工;S6、下飘窗板施工完毕后,进行验收。在主体结构施工时,建筑物外立面上飘窗板与楼层同步施工,下飘窗板预留钢筋,待同层模板拆除后再进行施工。该方法能加快施工进度、有效地控制每道工序的质量,做到工程一次成优,大大减少后期维修费用,减轻工期压力。本方法主要应用在建筑外立面飘窗板施工方面。
Building facade concrete bay window board construction method
一种建筑外立面混凝土飘窗板施工方法
LI CHUNHONG (Autor:in) / WANG LONGQIANG (Autor:in) / WANG YAPING (Autor:in) / WANG YONGGANG (Autor:in) / ZHAO TINGSHUAI (Autor:in) / WANG XIAODONG (Autor:in) / HOU WEI (Autor:in) / JI YUEKUI (Autor:in)
03.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Online Contents | 1999
|British Library Online Contents | 1999
|Facade assembly, building construction and method for mounting the facade assembly
Europäisches Patentamt | 2019
|Facade assembly, building construction and method for mounting the facade assembly
Europäisches Patentamt | 2018
|