Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete filling and leveling method and device for rapid road repair
The invention discloses a concrete filling and leveling-up method and device for rapid road repair. The method comprises the following steps: step 1, determining a road repair area, carrying out grinding of a surface layer of a to-be-repaired surface, and grinding the surface layer to the bottom end of a concrete layer; step 2, after grinding, setting a sleeve matching the groove in the groove formed through grinding, and sinking the sleeve by 10-15 cm; step 3, spraying water into the sleeve area until a to-be-processed surface layer in the sleeve is wetted by the water, then drilling a hole in the to-be-processed surface layer by fitting the inner side of the sleeve, taking out soil slag, and crushing the soil slag to be treated as a backing material; and step 4, taking out the sleeve, then filling the groove with the treated soil slag, carrying out tamping, and completing repairing. Damage to the pavement which does not need to be repaired is avoided, and the road repair concrete filling and leveling efficiency is greatly improved.
本发明公开了一种用于道路快速修复的混凝土填平方法及其装置,包括以下步骤:步骤1、确认道路修复面积,对待修复面表层进行磨平处理,并磨平至混凝土层底端;步骤2、磨平后,在磨平形成的凹槽内设置与凹槽适配的套筒,并使套筒下沉10‑15厘米;步骤3、在套筒区域内喷洒水,直至水浸湿套筒内待处理表层,再贴合套筒内侧向待处理表层钻孔,并取出土渣粉碎做底料处理;步骤4、将套筒取出,再将处理后的土渣填充至凹槽内,夯实,则修复完成。本发明避免了对不需修复路面的破坏,并极大的提高了道路修复混凝土填平效率。
Concrete filling and leveling method and device for rapid road repair
The invention discloses a concrete filling and leveling-up method and device for rapid road repair. The method comprises the following steps: step 1, determining a road repair area, carrying out grinding of a surface layer of a to-be-repaired surface, and grinding the surface layer to the bottom end of a concrete layer; step 2, after grinding, setting a sleeve matching the groove in the groove formed through grinding, and sinking the sleeve by 10-15 cm; step 3, spraying water into the sleeve area until a to-be-processed surface layer in the sleeve is wetted by the water, then drilling a hole in the to-be-processed surface layer by fitting the inner side of the sleeve, taking out soil slag, and crushing the soil slag to be treated as a backing material; and step 4, taking out the sleeve, then filling the groove with the treated soil slag, carrying out tamping, and completing repairing. Damage to the pavement which does not need to be repaired is avoided, and the road repair concrete filling and leveling efficiency is greatly improved.
本发明公开了一种用于道路快速修复的混凝土填平方法及其装置,包括以下步骤:步骤1、确认道路修复面积,对待修复面表层进行磨平处理,并磨平至混凝土层底端;步骤2、磨平后,在磨平形成的凹槽内设置与凹槽适配的套筒,并使套筒下沉10‑15厘米;步骤3、在套筒区域内喷洒水,直至水浸湿套筒内待处理表层,再贴合套筒内侧向待处理表层钻孔,并取出土渣粉碎做底料处理;步骤4、将套筒取出,再将处理后的土渣填充至凹槽内,夯实,则修复完成。本发明避免了对不需修复路面的破坏,并极大的提高了道路修复混凝土填平效率。
Concrete filling and leveling method and device for rapid road repair
用于道路快速修复的混凝土填平方法及其装置
ZHAO XIAODONG (Autor:in) / WANG SHUANBAO (Autor:in) / YAN JUNTING (Autor:in) / YU LITAO (Autor:in) / LIU YUANBO (Autor:in) / LUO MINGSHUAI (Autor:in) / LI LANXUN (Autor:in) / HAN RUI (Autor:in) / HE DONGDONG (Autor:in) / DONG WEISHU (Autor:in)
10.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Concrete filling and leveling-up device for road repair
Europäisches Patentamt | 2020
|High-strength leveling filling material for assembled road
Europäisches Patentamt | 2024
|Self-propelled road repairing concrete leveling device
Europäisches Patentamt | 2024
|