Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Deep foundation pit earthwork transport device and construction method
The invention discloses a deep foundation pit earthwork transport device and a construction method. The device includes a hoisting mechanism and a belt transport device, and the hoisting mechanism consists of a hoist and a belt; the belt transport device is composed of a support and a transport belt, and a plurality of earthwork transport hoppers are fixedly arranged above the transport belt; during the deep foundation pit earthwork transport process, the operation of the hoist drives the operation of the transport belt in the belt transport device through the belt, and the operation of the transport belt carries earth in the earthwork transport hoppers out of a foundation pit for direct loading and outward transportation so as to achieve faster removal of the earth from the foundation pit. The deep foundation pit earthwork transport device can faster improve the earthwork transport speed, and has the advantages of simple structure, high degree of automation, safe construction and highworking efficiency. Therefore, in the process of deep foundation pit earthwork transportation, the construction efficiency can be improved significantly, and the time of taking earth in traditional industry can be greatly shortened, and the difficult problems of related construction technology such as the slow earth-taking speed and difficult deep foundation pit earth-taking of a traditional machine are better solved.
本发明公开了一种深基坑土方运输装置及施工方法。该装置包括提升机构和皮带运输装置,提升机构由提升机和皮带构成;皮带运输装置由支架和运输皮带构成,运输皮带上面固定设有多个土方运输斗;在深基坑土方运输过程中,提升机的运行通过皮带带动皮带运输装置中的运输皮带的运行,运输皮带的运行把土方运输斗中的土方运出基坑直接进行装车往外运输,以此来实现更快的将深基坑的土方运出基坑。本发明装置能更快的提升土方运输速度,具有结构简单、自动化成度高、施工安全和工作效率高的优点。因此在深基坑土方运输过程中能显著提高施工效率,大幅减小了传统行业取土的时间,能很好的解决传统机器取土速度慢、深基坑难取土等相关施工技术的难题。
Deep foundation pit earthwork transport device and construction method
The invention discloses a deep foundation pit earthwork transport device and a construction method. The device includes a hoisting mechanism and a belt transport device, and the hoisting mechanism consists of a hoist and a belt; the belt transport device is composed of a support and a transport belt, and a plurality of earthwork transport hoppers are fixedly arranged above the transport belt; during the deep foundation pit earthwork transport process, the operation of the hoist drives the operation of the transport belt in the belt transport device through the belt, and the operation of the transport belt carries earth in the earthwork transport hoppers out of a foundation pit for direct loading and outward transportation so as to achieve faster removal of the earth from the foundation pit. The deep foundation pit earthwork transport device can faster improve the earthwork transport speed, and has the advantages of simple structure, high degree of automation, safe construction and highworking efficiency. Therefore, in the process of deep foundation pit earthwork transportation, the construction efficiency can be improved significantly, and the time of taking earth in traditional industry can be greatly shortened, and the difficult problems of related construction technology such as the slow earth-taking speed and difficult deep foundation pit earth-taking of a traditional machine are better solved.
本发明公开了一种深基坑土方运输装置及施工方法。该装置包括提升机构和皮带运输装置,提升机构由提升机和皮带构成;皮带运输装置由支架和运输皮带构成,运输皮带上面固定设有多个土方运输斗;在深基坑土方运输过程中,提升机的运行通过皮带带动皮带运输装置中的运输皮带的运行,运输皮带的运行把土方运输斗中的土方运出基坑直接进行装车往外运输,以此来实现更快的将深基坑的土方运出基坑。本发明装置能更快的提升土方运输速度,具有结构简单、自动化成度高、施工安全和工作效率高的优点。因此在深基坑土方运输过程中能显著提高施工效率,大幅减小了传统行业取土的时间,能很好的解决传统机器取土速度慢、深基坑难取土等相关施工技术的难题。
Deep foundation pit earthwork transport device and construction method
深基坑土方运输装置及施工方法
LI AI (Autor:in) / YU CHENG (Autor:in) / ZHANG YONG (Autor:in) / WANG CHANGYU (Autor:in) / CHEN DA (Autor:in)
10.07.2020
Patent
Elektronische Ressource
Chinesisch
Earthwork construction method for gallery road foundation
Europäisches Patentamt | 2022
|Deep foundation pit earthwork transportation device and excavation method
Europäisches Patentamt | 2024
|Foundation pit group earthwork construction auxiliary ramp
Europäisches Patentamt | 2023
|Construction method for outward transportation of earthwork of ultra-deep foundation pit
Europäisches Patentamt | 2024
|