Building floor foundation construction method for blocking and removing radon gas
The present invention relates to a building floor foundation construction method for blocking and removing radon gas, which can prevent gas-phased radon gas generated in soil under a building, and cancollect radon gas and discharge and remove the same in the air to prevent the radon gas from flowing into the building. The building floor foundation construction method comprises the following steps: a soil digging step; a plastic setting step; a leveling concrete pouring step; a thermal insulation material setting step; a gravel spraying step; a trapping pad setting step; a trapping pipe setting step; and a decorative material construction step or an earth cutting step; an underground beam arranging step; a soil filling step; a plastic setting step; a leveling concrete pouring step; a thermal insulation material setting step; a gravel spraying step; a trapping pad setting step; a trapping pipe setting step; and a decorative material construction step. Moreover, a membrane installation step can be further included when a measurement value of radon gas in soil is 10,000 Bq/m<3> or more.
本发明可以阻挡在建筑物地下的土壤中产生的气态的氡气,并且,捕集氡气向大气中排放去除,从而,可以防止氡气流入建筑物室内,可以包括:挖土步骤;塑料设置步骤;找平混凝土浇注步骤;隔热材料设置步骤;砾石喷洒步骤;捕集垫设置步骤;捕集管设置步骤;以及装饰材料施工步骤,或者挖土步骤;地下梁设置步骤;填土步骤;塑料设置步骤;找平混凝土浇注步骤;隔热材料设置步骤;砾石喷洒步骤;捕集垫设置步骤;捕集管设置步骤;以及装饰材料施工步骤。当土壤中的氡气的测量值为10,000Bq/m以上时,可以进一步包括膜片设置步骤。
Building floor foundation construction method for blocking and removing radon gas
The present invention relates to a building floor foundation construction method for blocking and removing radon gas, which can prevent gas-phased radon gas generated in soil under a building, and cancollect radon gas and discharge and remove the same in the air to prevent the radon gas from flowing into the building. The building floor foundation construction method comprises the following steps: a soil digging step; a plastic setting step; a leveling concrete pouring step; a thermal insulation material setting step; a gravel spraying step; a trapping pad setting step; a trapping pipe setting step; and a decorative material construction step or an earth cutting step; an underground beam arranging step; a soil filling step; a plastic setting step; a leveling concrete pouring step; a thermal insulation material setting step; a gravel spraying step; a trapping pad setting step; a trapping pipe setting step; and a decorative material construction step. Moreover, a membrane installation step can be further included when a measurement value of radon gas in soil is 10,000 Bq/m<3> or more.
本发明可以阻挡在建筑物地下的土壤中产生的气态的氡气,并且,捕集氡气向大气中排放去除,从而,可以防止氡气流入建筑物室内,可以包括:挖土步骤;塑料设置步骤;找平混凝土浇注步骤;隔热材料设置步骤;砾石喷洒步骤;捕集垫设置步骤;捕集管设置步骤;以及装饰材料施工步骤,或者挖土步骤;地下梁设置步骤;填土步骤;塑料设置步骤;找平混凝土浇注步骤;隔热材料设置步骤;砾石喷洒步骤;捕集垫设置步骤;捕集管设置步骤;以及装饰材料施工步骤。当土壤中的氡气的测量值为10,000Bq/m以上时,可以进一步包括膜片设置步骤。
Building floor foundation construction method for blocking and removing radon gas
用于阻挡及去除氡气的建筑地板基础施工方法
KIM HONG BAE (Autor:in)
14.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Method for Construction of Foundation Floor for Reduction Radon
Europäisches Patentamt | 2021
Method for Construction of Foundation Floor for Reduction Radon
Europäisches Patentamt | 2020
|Method for Construction of Foundation Floor for Reduction Radon
Europäisches Patentamt | 2021
Method for Construction of Foundation Floor for Reduction Radon
Europäisches Patentamt | 2020
|Floor formwork removing device for building construction
Europäisches Patentamt | 2024
|