Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Arch structure sliding rail side inclination sliding construction method and device
The invention provides an arch structure sliding rail side inclination sliding construction method and device. According to the method, the bearing reaction force of a base of an arch structure in thesliding process is calculated based on the structure parameter of the arch structure, the side inclination angle of the supporting surface of the base in the sliding process of the arch structure iscalculated according to the bearing reaction force of the base, and thus the side inclination degree of the arch structure in the sliding process can be determined more reasonably; and besides, the arch structure sliding device is provided, so that the thrust at springer of the arch structure in the sliding construction process can be balanced to the maximum degree, the horizontal deformation of the arch structure in the span direction can be controlled, the construction efficiency can be improved, and the construction cost can be reduced.
本发明提供一种拱形结构滑轨侧斜滑移施工方法及装置,其中该方法通过对拱形结构的结构参数计算滑移过程中拱形结构的底座支反力,并根据底座支反力计算拱形结构滑移过程中底座支撑面的侧斜角度,可以更合理地确定拱形结构滑移过程中的侧斜角度,并提供一种拱形结构滑移装置从而最大程度上平衡滑移施工过程中拱形结构的拱脚推力,控制拱形结构跨度方向的水平变形,提高施工效率,降低施工成本。
Arch structure sliding rail side inclination sliding construction method and device
The invention provides an arch structure sliding rail side inclination sliding construction method and device. According to the method, the bearing reaction force of a base of an arch structure in thesliding process is calculated based on the structure parameter of the arch structure, the side inclination angle of the supporting surface of the base in the sliding process of the arch structure iscalculated according to the bearing reaction force of the base, and thus the side inclination degree of the arch structure in the sliding process can be determined more reasonably; and besides, the arch structure sliding device is provided, so that the thrust at springer of the arch structure in the sliding construction process can be balanced to the maximum degree, the horizontal deformation of the arch structure in the span direction can be controlled, the construction efficiency can be improved, and the construction cost can be reduced.
本发明提供一种拱形结构滑轨侧斜滑移施工方法及装置,其中该方法通过对拱形结构的结构参数计算滑移过程中拱形结构的底座支反力,并根据底座支反力计算拱形结构滑移过程中底座支撑面的侧斜角度,可以更合理地确定拱形结构滑移过程中的侧斜角度,并提供一种拱形结构滑移装置从而最大程度上平衡滑移施工过程中拱形结构的拱脚推力,控制拱形结构跨度方向的水平变形,提高施工效率,降低施工成本。
Arch structure sliding rail side inclination sliding construction method and device
一种拱形结构滑轨侧斜滑移施工方法及装置
WANG LONG (Autor:in) / WEN JIANMING (Autor:in) / CAO JIALI (Autor:in) / WEI WEI (Autor:in) / YE WENJIAN (Autor:in)
17.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Sliding construction method of large-span prestressed arch structure
Europäisches Patentamt | 2024
|INCLINATION CORRESPONDING HORIZONTAL SLIDING SHUTTER DEVICE
Europäisches Patentamt | 2023
|Sliding structure for side sliding door and side sliding door
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|