Turnout rapid construction apparatus and method during existing station transformation
The invention discloses a turnout rapid construction apparatus and method during existing station transformation, and relates to the technical field of existing station turnout construction. The apparatus mainly comprises a pre-paving platform, a lifting device, a walking device and a traction device. The construction method mainly comprises the following steps: the pre-paving platform is erected,a turnout is pre-paved, debugged and accepted on the platform, and the lifting device, the walking device and a traction device are installed; a construction area is blocked, the train operation is stopped, and the construction time is determined; the turnout is transversely moved to cross a rail; the turnout is longitudinally moved to the outer side of a turnout laying position; an existing lineat the laying position is removed from the point; the turnout is placed in place through transverse movement, and the walking device is dismantled; the elevation and direction of the turnout are adjusted; the turnout is finely adjusted; and electric service debugging and work acceptance are carried out, and a blocking line is opened after qualification. Various advanced processes of turnout pointconstruction are integrated, specialized organization is facilitated, and use is convenient.
本发明公开一种既有车站改造时道岔快速施工装置及方法,涉及既有车站道岔施工技术领域,装置主要包括预铺平台、升降装置、走行装置和牵引装置;本发明施工方法主要包括:搭设预铺平台,在平台上预铺、调试和验收道岔,安装升降装置、走行装置和牵引装置;封锁施工区域,停止列车运行,确定施工时间;将道岔横移过轨;将道岔纵移到道岔铺设位置外侧;点起同时拆除铺设位置既有线路;通过横移将道岔就位拆除走行装置;调整道岔标高和方向;对道岔进行精调;进行电务调试和工务验收,合格后开通封锁线路。本发明综合了道岔要点施工的多种工序先进的工艺,便于专业化组织,使用方便。
Turnout rapid construction apparatus and method during existing station transformation
The invention discloses a turnout rapid construction apparatus and method during existing station transformation, and relates to the technical field of existing station turnout construction. The apparatus mainly comprises a pre-paving platform, a lifting device, a walking device and a traction device. The construction method mainly comprises the following steps: the pre-paving platform is erected,a turnout is pre-paved, debugged and accepted on the platform, and the lifting device, the walking device and a traction device are installed; a construction area is blocked, the train operation is stopped, and the construction time is determined; the turnout is transversely moved to cross a rail; the turnout is longitudinally moved to the outer side of a turnout laying position; an existing lineat the laying position is removed from the point; the turnout is placed in place through transverse movement, and the walking device is dismantled; the elevation and direction of the turnout are adjusted; the turnout is finely adjusted; and electric service debugging and work acceptance are carried out, and a blocking line is opened after qualification. Various advanced processes of turnout pointconstruction are integrated, specialized organization is facilitated, and use is convenient.
本发明公开一种既有车站改造时道岔快速施工装置及方法,涉及既有车站道岔施工技术领域,装置主要包括预铺平台、升降装置、走行装置和牵引装置;本发明施工方法主要包括:搭设预铺平台,在平台上预铺、调试和验收道岔,安装升降装置、走行装置和牵引装置;封锁施工区域,停止列车运行,确定施工时间;将道岔横移过轨;将道岔纵移到道岔铺设位置外侧;点起同时拆除铺设位置既有线路;通过横移将道岔就位拆除走行装置;调整道岔标高和方向;对道岔进行精调;进行电务调试和工务验收,合格后开通封锁线路。本发明综合了道岔要点施工的多种工序先进的工艺,便于专业化组织,使用方便。
Turnout rapid construction apparatus and method during existing station transformation
一种既有车站改造时道岔快速施工装置及方法
LIU JIANWEN (Autor:in) / SHI JUNWEI (Autor:in) / DENG CHAOHUI (Autor:in) / CHAI LEI (Autor:in) / LI JILONG (Autor:in) / WANG TIECHENG (Autor:in) / JIANG YAFENG (Autor:in) / ZHANG YANKE (Autor:in) / LIU SHUAIFANG (Autor:in) / SONG SUHUA (Autor:in)
24.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Rapid construction device and method for existing line station transformation turnout
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2023
|Railway station turnout reinforcing device and method
Europäisches Patentamt | 2020
|