Soft foundation treatment split mounting type gabion mesh replacing structure and construction method
The invention relates to a soft foundation treatment split mounting type gabion mesh replacing structure and a construction method. After the surface of a soft foundation section is cleaned and the field is leveled, a gabion mesh structure body is laid, the gabion mesh structure body is connected in the mode that forward-backward and leftward-rightward component outward-extending steel bars are inserted into top surface and bottom surface component studs, the top surface and the bottom surface of the gabion mesh are connected in a manner that an outwards-extending steel bar on one side of onetop surface and bottom surface component is inserted into the stud on the other side surface of the other top surface and bottom surface component, a cuboid mold is arranged in a gabion mesh structurebody unit area and is used for backfilling a replacement material, the mold is taken out after backfilling is completed and is covered with a gabion mesh structure body top component to form the gabion mesh structure body, and a cushion layer, an embankment and a pavement structure layer are arranged on the upper portion of the gabion mesh structure body. According to the soft foundation treatment structure, a manual replacement layer with high tensile strength and good integrity is formed on the surface layer of the soft soil, subgrade settlement can be effectively reduced, the subgrade stability is improved, the construction cost can be saved, the construction progress is accelerated, the environment is protected, and good economic and technical benefits are achieved.
本发明涉及一种软基处理拼装式宾格网换填结构及施工方法,软基段落清表、场地整平后铺设宾格网结构体,所述的宾格网结构体采用前后向和左右向构件外伸钢筋插入顶面与底面构件螺柱的方式连接,所述的宾格网顶面与底面之间采用一个顶面与底面构件一侧外伸钢筋插入另一个顶面与底面构件另一侧面螺柱的方式连接,所述宾格网结构体单元区域内部设置有长方体模具,所述的模具用于回填换填材料,回填完成后取出模具,加盖宾格网结构体顶部构件,组成宾格网结构体,所述宾格网结构体上部为垫层、路堤、路面结构层。本发明所涉及的软基处理结构在软土表层形成抗拉强度高、整体性较好的人工换填层,不仅能有效降低路基沉降、提高路基的稳定性,而且可以节省施工成本、加快施工进度和保护环境,具有良好的经济技术效益。
Soft foundation treatment split mounting type gabion mesh replacing structure and construction method
The invention relates to a soft foundation treatment split mounting type gabion mesh replacing structure and a construction method. After the surface of a soft foundation section is cleaned and the field is leveled, a gabion mesh structure body is laid, the gabion mesh structure body is connected in the mode that forward-backward and leftward-rightward component outward-extending steel bars are inserted into top surface and bottom surface component studs, the top surface and the bottom surface of the gabion mesh are connected in a manner that an outwards-extending steel bar on one side of onetop surface and bottom surface component is inserted into the stud on the other side surface of the other top surface and bottom surface component, a cuboid mold is arranged in a gabion mesh structurebody unit area and is used for backfilling a replacement material, the mold is taken out after backfilling is completed and is covered with a gabion mesh structure body top component to form the gabion mesh structure body, and a cushion layer, an embankment and a pavement structure layer are arranged on the upper portion of the gabion mesh structure body. According to the soft foundation treatment structure, a manual replacement layer with high tensile strength and good integrity is formed on the surface layer of the soft soil, subgrade settlement can be effectively reduced, the subgrade stability is improved, the construction cost can be saved, the construction progress is accelerated, the environment is protected, and good economic and technical benefits are achieved.
本发明涉及一种软基处理拼装式宾格网换填结构及施工方法,软基段落清表、场地整平后铺设宾格网结构体,所述的宾格网结构体采用前后向和左右向构件外伸钢筋插入顶面与底面构件螺柱的方式连接,所述的宾格网顶面与底面之间采用一个顶面与底面构件一侧外伸钢筋插入另一个顶面与底面构件另一侧面螺柱的方式连接,所述宾格网结构体单元区域内部设置有长方体模具,所述的模具用于回填换填材料,回填完成后取出模具,加盖宾格网结构体顶部构件,组成宾格网结构体,所述宾格网结构体上部为垫层、路堤、路面结构层。本发明所涉及的软基处理结构在软土表层形成抗拉强度高、整体性较好的人工换填层,不仅能有效降低路基沉降、提高路基的稳定性,而且可以节省施工成本、加快施工进度和保护环境,具有良好的经济技术效益。
Soft foundation treatment split mounting type gabion mesh replacing structure and construction method
一种软基处理拼装式宾格网换填结构及施工方法
ZHANG ZHIFENG (Autor:in) / CHEN XIUHE (Autor:in) / CHEN XIULIN (Autor:in) / ZHAO HUAHONG (Autor:in) / CHEN XING (Autor:in) / TU JUN (Autor:in)
24.07.2020
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2018
|GABION, AND GABION STRUCTURE CONFIGURED BY THE GABION
Europäisches Patentamt | 2016
|