Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Device applied to bridgehead bumping in soft soil area, and rapid treatment method thereof
The invention discloses a device applied to bridgehead bumping in a soft soil area, and a rapid treatment method thereof. The device comprises a prefabricated light block body installed on an originalbottom soil layer, a geotechnical cloth located above the light block body, a reinforcing layer located above the geotechnical cloth, and a prefabricated hard block body located above the reinforcinglayer, and a fixing device is arranged between the light block body and the hard block body. The prefabricated light block body and the prefabricated hard block body are arranged on the original bottom soil layer, so bad road sections can be conveniently and rapidly repaired; and meanwhile, the fixing device is arranged between the light block body and the hard block body, so the structure of thedevice is more stable, a certain damping effect is achieved, and the phenomenon of bumping at the bridge head is avoided.
本发明公开了一种应用于软土地区桥头跳车的装置及其快速处治方法,包括安装于原底部土层的预先制好的轻质块体、位于轻质块体上方的土工布、位于土工布上方的加强层以及位于加强层上方的预先制好的硬质块体,所述轻质块体和硬质块体之间设有固定装置。在原底部土层设置预先制好的轻质块体和硬质块体,可以方便快速的修复不良路段,同时在轻质块体和硬质块体之间设置固定装置,使该装置结构更稳定,也具有一定的减震作用,避免了桥头跳车的现象。
Device applied to bridgehead bumping in soft soil area, and rapid treatment method thereof
The invention discloses a device applied to bridgehead bumping in a soft soil area, and a rapid treatment method thereof. The device comprises a prefabricated light block body installed on an originalbottom soil layer, a geotechnical cloth located above the light block body, a reinforcing layer located above the geotechnical cloth, and a prefabricated hard block body located above the reinforcinglayer, and a fixing device is arranged between the light block body and the hard block body. The prefabricated light block body and the prefabricated hard block body are arranged on the original bottom soil layer, so bad road sections can be conveniently and rapidly repaired; and meanwhile, the fixing device is arranged between the light block body and the hard block body, so the structure of thedevice is more stable, a certain damping effect is achieved, and the phenomenon of bumping at the bridge head is avoided.
本发明公开了一种应用于软土地区桥头跳车的装置及其快速处治方法,包括安装于原底部土层的预先制好的轻质块体、位于轻质块体上方的土工布、位于土工布上方的加强层以及位于加强层上方的预先制好的硬质块体,所述轻质块体和硬质块体之间设有固定装置。在原底部土层设置预先制好的轻质块体和硬质块体,可以方便快速的修复不良路段,同时在轻质块体和硬质块体之间设置固定装置,使该装置结构更稳定,也具有一定的减震作用,避免了桥头跳车的现象。
Device applied to bridgehead bumping in soft soil area, and rapid treatment method thereof
一种应用于软土地区桥头跳车的装置及其快速处治方法
ZHU HANHUA (Autor:in) / CHEN LIPING (Autor:in) / YING GUOGANG (Autor:in)
24.07.2020
Patent
Elektronische Ressource
Chinesisch
Soft soil foundation bridgehead bumping eliminating device
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Rapid post-processing device for bumping at bridgehead
Europäisches Patentamt | 2024
|Intelligent device for repairing bridgehead bumping disease
Europäisches Patentamt | 2022
|