Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Wind and snow prevention shed tunnel construction method
The invention discloses a wind and snow prevention shed tunnel construction method, and relates to the field of building construction methods. The wind and snow prevention shed tunnel construction method comprises the process steps of construction preparation, cast-in-situ bored pile construction, foundation straining beam construction, frame column construction, frame beam construction, masonry engineering construction, steel corrugated plate installation and safety facility construction. The process step of the cast-in-situ bored pile construction comprises the steps of pile position measurement, drilling, hole cleaning and hole inspection, reinforcement cage manufacturing and mounting, pile foundation concrete pouring and pile body quality detection. The process of the frame beam construction comprises the steps of scaffold erecting, steel bar binding, formwork erecting, concrete pouring and concrete curing. The process of the steel corrugated plate installation comprises the stepsof steel corrugated plate installation and PC endurance plate installation. The method is simple in process operation, convenient for quality control, fast in construction progress, capable of greatlyreducing the construction cost, and suitable for being used in the construction of shed tunnel projects for treating wind and snow disasters of various levels of highways.
本发明公开了一种防风雪棚洞施工方法,涉及建筑施工方法领域,一种防风雪棚洞施工方法,包括工艺步骤施工准备、钻孔灌注桩施工、基础拉梁施工、框架柱施工、框架梁施工、砌筑工程施工、钢波纹板安装、安全设施施工,所述工艺步骤钻孔灌注桩施工的流程为测定桩位、钻孔、清孔及验孔、钢筋笼制作及安装、桩基混凝土灌注、桩身质量检测;所述框架梁施工的流程为脚手架搭设、钢筋绑扎、模板支设、混凝土浇筑、混凝土养护;所述钢波纹板安装的流程包括钢波纹板安装及PC耐力板安装。本发明工艺操作简单,便于质量控制,施工进度快,同时能大幅降低施工成本,本发明适合在各等级公路风雪灾害治理棚洞工程的施工中使用。
Wind and snow prevention shed tunnel construction method
The invention discloses a wind and snow prevention shed tunnel construction method, and relates to the field of building construction methods. The wind and snow prevention shed tunnel construction method comprises the process steps of construction preparation, cast-in-situ bored pile construction, foundation straining beam construction, frame column construction, frame beam construction, masonry engineering construction, steel corrugated plate installation and safety facility construction. The process step of the cast-in-situ bored pile construction comprises the steps of pile position measurement, drilling, hole cleaning and hole inspection, reinforcement cage manufacturing and mounting, pile foundation concrete pouring and pile body quality detection. The process of the frame beam construction comprises the steps of scaffold erecting, steel bar binding, formwork erecting, concrete pouring and concrete curing. The process of the steel corrugated plate installation comprises the stepsof steel corrugated plate installation and PC endurance plate installation. The method is simple in process operation, convenient for quality control, fast in construction progress, capable of greatlyreducing the construction cost, and suitable for being used in the construction of shed tunnel projects for treating wind and snow disasters of various levels of highways.
本发明公开了一种防风雪棚洞施工方法,涉及建筑施工方法领域,一种防风雪棚洞施工方法,包括工艺步骤施工准备、钻孔灌注桩施工、基础拉梁施工、框架柱施工、框架梁施工、砌筑工程施工、钢波纹板安装、安全设施施工,所述工艺步骤钻孔灌注桩施工的流程为测定桩位、钻孔、清孔及验孔、钢筋笼制作及安装、桩基混凝土灌注、桩身质量检测;所述框架梁施工的流程为脚手架搭设、钢筋绑扎、模板支设、混凝土浇筑、混凝土养护;所述钢波纹板安装的流程包括钢波纹板安装及PC耐力板安装。本发明工艺操作简单,便于质量控制,施工进度快,同时能大幅降低施工成本,本发明适合在各等级公路风雪灾害治理棚洞工程的施工中使用。
Wind and snow prevention shed tunnel construction method
一种防风雪棚洞施工方法
WANG PANPAN (Autor:in) / MA ZHENBIN (Autor:in) / ZHANG CHENG (Autor:in) / LU WEIHUA (Autor:in) / ZHAO XIAOJUN (Autor:in) / ZHOU BIN (Autor:in) / HUANG GUANGGUANG (Autor:in) / ZHONG XIAOLING (Autor:in)
24.07.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Engineering Index Backfile | 1895
Rockfall protection shed tunnel and construction method thereof
Europäisches Patentamt | 2022
|Shed-tunnel combined novel support structure and construction method
Europäisches Patentamt | 2020
|