High-stability water cut-off excavating device of deep foundation pit engineering and excavating method
The invention relates to the technical field of engineering building structure foundation pit excavating, in particular to a high-stability water cut-off excavating device of deep foundation pit engineering. The device comprises a foundation pit face, a first slope surface and a second slope surface are arranged on the edge of the foundation pit face, the first slope surface is located above the second slope surface, a sloping platform is mounted between the first slope surface and the second slope surface, a first catchwater is mounted at the upper end of the first slope surface, a second catchwater is mounted at the lower end of the second slope surface, waterproof layers are paved on the first slope surface, the sloping platform and the second slope surface, abutting-against mechanismsare mounted on the sloping platform and the foundation pit face, and comprise multiple abutting-against frames capable of abutting against the first slope surface and the second slope surface, a soilaccumulating bin is mounted on the foundation pit face, two soil conveying mechanisms are mounted on one side of a soil accumulating groove, the output end of each soil conveying mechanism is providedwith a soil conveying conveyor, according to the technical scheme, the deep foundation pit safety can be effectively protected, accumulated water can be drained to the maximum degree, and the soil conveying construction cost is reduced.
本发明涉及工程建构筑物基坑开挖技术领域,具体是涉及一种深基坑工程的高稳定性截水开挖设备,包括基坑面,所述基坑面的边缘处分别设有第一坡面和第二坡面,第一坡面位于第二坡面的上方,第一坡面与第二坡面之间设有放坡平台,第一坡面的上端设有第一截水沟,第二坡面的下端设有第二截水沟,第一坡面、放坡平台和第二坡面上铺设有防水层,放坡平台和基坑面上分别设有抵触机构,抵触机构包括若干个分别能够抵触第一坡面和第二坡面的抵触架,基坑面设有积土仓,积土槽的一侧设有两个送土机构,每个送土机构的输出端分别设有送土输送机,该技术方案解决了有效地保护深基坑安全,最大程度的将积水进行排出,并且能够降低送土施工成本。
High-stability water cut-off excavating device of deep foundation pit engineering and excavating method
The invention relates to the technical field of engineering building structure foundation pit excavating, in particular to a high-stability water cut-off excavating device of deep foundation pit engineering. The device comprises a foundation pit face, a first slope surface and a second slope surface are arranged on the edge of the foundation pit face, the first slope surface is located above the second slope surface, a sloping platform is mounted between the first slope surface and the second slope surface, a first catchwater is mounted at the upper end of the first slope surface, a second catchwater is mounted at the lower end of the second slope surface, waterproof layers are paved on the first slope surface, the sloping platform and the second slope surface, abutting-against mechanismsare mounted on the sloping platform and the foundation pit face, and comprise multiple abutting-against frames capable of abutting against the first slope surface and the second slope surface, a soilaccumulating bin is mounted on the foundation pit face, two soil conveying mechanisms are mounted on one side of a soil accumulating groove, the output end of each soil conveying mechanism is providedwith a soil conveying conveyor, according to the technical scheme, the deep foundation pit safety can be effectively protected, accumulated water can be drained to the maximum degree, and the soil conveying construction cost is reduced.
本发明涉及工程建构筑物基坑开挖技术领域,具体是涉及一种深基坑工程的高稳定性截水开挖设备,包括基坑面,所述基坑面的边缘处分别设有第一坡面和第二坡面,第一坡面位于第二坡面的上方,第一坡面与第二坡面之间设有放坡平台,第一坡面的上端设有第一截水沟,第二坡面的下端设有第二截水沟,第一坡面、放坡平台和第二坡面上铺设有防水层,放坡平台和基坑面上分别设有抵触机构,抵触机构包括若干个分别能够抵触第一坡面和第二坡面的抵触架,基坑面设有积土仓,积土槽的一侧设有两个送土机构,每个送土机构的输出端分别设有送土输送机,该技术方案解决了有效地保护深基坑安全,最大程度的将积水进行排出,并且能够降低送土施工成本。
High-stability water cut-off excavating device of deep foundation pit engineering and excavating method
一种深基坑工程的高稳定性截水开挖设备以及开挖方法
24.07.2020
Patent
Elektronische Ressource
Chinesisch
Deep foundation pit excavating device with open-close type excavating head
Europäisches Patentamt | 2021
|Excavating system of deep foundation pit and excavating construction method of deep foundation pit
Europäisches Patentamt | 2022
|