Construction trolley installed on outside of box girder and capable of telescopically passing through pier body
The invention relates to the technical field of civil engineering, particularly relating to a construction trolley installed on outside of a box girder and capable of telescopically passing through apier body. The lower end of a support body is designed to be a rotatable mechanism to complete a process of giving way to a bridge pier. The elasticity of an elastic steel block and a mechanism matching the elastic steel block are used for completing the rapid butt joint process, the efficiency problem in the unified operation process is solved, the material cost is saved, meanwhile, the operationspeed and the operation efficiency are improved, the construction progress is accelerated, and the construction period is shortened.
本发明涉及土木工程技术领域,具体涉及一种安装在箱梁外侧可伸缩通过墩身的施工台车,本发明通过对支架体下端设计成一种可旋转的机构来完成对桥墩让行运行的一个过程,同时利用弹性钢块的弹性以及与之配合的机构来完成快速对接的过程,实现了统一运行过程中的效率问题,不但节省的材料成本,同时提高了运行速度和运行效率,增加了施工进度,加快了施工周期。
Construction trolley installed on outside of box girder and capable of telescopically passing through pier body
The invention relates to the technical field of civil engineering, particularly relating to a construction trolley installed on outside of a box girder and capable of telescopically passing through apier body. The lower end of a support body is designed to be a rotatable mechanism to complete a process of giving way to a bridge pier. The elasticity of an elastic steel block and a mechanism matching the elastic steel block are used for completing the rapid butt joint process, the efficiency problem in the unified operation process is solved, the material cost is saved, meanwhile, the operationspeed and the operation efficiency are improved, the construction progress is accelerated, and the construction period is shortened.
本发明涉及土木工程技术领域,具体涉及一种安装在箱梁外侧可伸缩通过墩身的施工台车,本发明通过对支架体下端设计成一种可旋转的机构来完成对桥墩让行运行的一个过程,同时利用弹性钢块的弹性以及与之配合的机构来完成快速对接的过程,实现了统一运行过程中的效率问题,不但节省的材料成本,同时提高了运行速度和运行效率,增加了施工进度,加快了施工周期。
Construction trolley installed on outside of box girder and capable of telescopically passing through pier body
一种安装在箱梁外侧可伸缩通过墩身的施工台车
ZHANG BIN (Autor:in) / ZUO YI (Autor:in) / WANG CHANGXI (Autor:in) / CAI TIAN (Autor:in) / QU TUNFU (Autor:in) / CHEN SHANGQIAN (Autor:in) / YANG JIAN (Autor:in)
07.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Steel tube tower structure capable of being installed telescopically
Europäisches Patentamt | 2023
|Single-side separation walking box girder detection car capable of passing pier
Europäisches Patentamt | 2015
|Pier column construction platform capable of being quickly installed
Europäisches Patentamt | 2021
|Pier and beam integrated bridge girder erection machine and hole passing construction method
Europäisches Patentamt | 2021
|