Backfill type basement construction method
The invention provides a backfill type basement construction method. The backfill type basement construction method comprises the following steps that basement wall construction is carried out firstly, basement walls comprise a high-span area wall and a low-span area wall, the high-span area wall is constructed to the position of the bottom of a secondary beam of a high-span area, and the low-spanarea wall is constructed to the position of the slab bottom of a first-layer beam slab of a low-span area; then earthwork of the internal space gap of a high-span area basement and earthwork of the internal space gap of a low-span area basement are backfilled, the earthwork of the internal space gap of the high-span area basement is backfilled to the position of the bottom of the secondary beam,and the earthwork of the internal space gap of the low-span area basement is backfilled to the position of the slab bottom of the first-layer beam slab of the low-span area; then the first-layer beamslab of the low-span area is poured, primary and secondary beams of the high-span area are constructed, and the primary and secondary beams of the high-span area are constructed to the position of theslab bottom of the first-layer beam slab of the low-span area; and finally, slab bottom form erecting and steel bar binding of the first-layer beam slab in the high-span area are conducted, and the first-layer beam slab in the high-span area is poured.
本发明提供了一种回填式地下室施工方法,首先进行地下室墙体施工,地下室墙体包括高跨区域墙体和低跨区域墙体,高跨区域墙体施工至高跨区域的次梁底位置,低跨区域的墙体施工至低跨区域的首层梁板的板底位置;然后回填高跨区域地下室的内部空间间隙的土方以及低跨区域地下室的内部空间间隙的土方,高跨区域地下室的内部空间间隙的土方回填至次梁底位置,低跨区域地下室的内部空间间隙的土方回填至低跨区域的首层梁板的板底位置;之后浇筑低跨区域的首层梁板,施工高跨区域的主次梁,高跨区域的主次梁施工至高跨区域的首层梁板的板底位置;最后进行高跨区域的首层梁板的板底模支设、钢筋绑扎,浇筑高跨区域的首层梁板。
Backfill type basement construction method
The invention provides a backfill type basement construction method. The backfill type basement construction method comprises the following steps that basement wall construction is carried out firstly, basement walls comprise a high-span area wall and a low-span area wall, the high-span area wall is constructed to the position of the bottom of a secondary beam of a high-span area, and the low-spanarea wall is constructed to the position of the slab bottom of a first-layer beam slab of a low-span area; then earthwork of the internal space gap of a high-span area basement and earthwork of the internal space gap of a low-span area basement are backfilled, the earthwork of the internal space gap of the high-span area basement is backfilled to the position of the bottom of the secondary beam,and the earthwork of the internal space gap of the low-span area basement is backfilled to the position of the slab bottom of the first-layer beam slab of the low-span area; then the first-layer beamslab of the low-span area is poured, primary and secondary beams of the high-span area are constructed, and the primary and secondary beams of the high-span area are constructed to the position of theslab bottom of the first-layer beam slab of the low-span area; and finally, slab bottom form erecting and steel bar binding of the first-layer beam slab in the high-span area are conducted, and the first-layer beam slab in the high-span area is poured.
本发明提供了一种回填式地下室施工方法,首先进行地下室墙体施工,地下室墙体包括高跨区域墙体和低跨区域墙体,高跨区域墙体施工至高跨区域的次梁底位置,低跨区域的墙体施工至低跨区域的首层梁板的板底位置;然后回填高跨区域地下室的内部空间间隙的土方以及低跨区域地下室的内部空间间隙的土方,高跨区域地下室的内部空间间隙的土方回填至次梁底位置,低跨区域地下室的内部空间间隙的土方回填至低跨区域的首层梁板的板底位置;之后浇筑低跨区域的首层梁板,施工高跨区域的主次梁,高跨区域的主次梁施工至高跨区域的首层梁板的板底位置;最后进行高跨区域的首层梁板的板底模支设、钢筋绑扎,浇筑高跨区域的首层梁板。
Backfill type basement construction method
回填式地下室施工方法
CHEN YUSHENG (Autor:in) / ZHANG ZHENGHONG (Autor:in) / FANG WEIQIANG (Autor:in) / WANG WENCHAO (Autor:in) / ZHU YUANZHEN (Autor:in) / YU GAI (Autor:in)
07.08.2020
Patent
Elektronische Ressource
Chinesisch
Backfill reverse construction method for basement cantilever slab
Europäisches Patentamt | 2021
|Basement backfill soil layer structure floor slab construction method
Europäisches Patentamt | 2021
|Basement-free house core backfill material and construction method thereof
Europäisches Patentamt | 2024
|Ramp structure based on backfill soil base layer at basement entrance and construction method
Europäisches Patentamt | 2024
|