Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Treatment technology for integrated floor ground gap
The invention provides a treatment technology for an integrated floor ground gap. The treatment technology for the integrated floor ground gap comprises a keel frame. The outer surfaces of the two sides of the keel frame are fixedly provided with main boards. The outer surface of the upper end of the keel frame is fixedly provided with an integrated floor. A steel beam is fixedly installed in themiddle of the outer surface of the upper end of the keel frame. Steel plates are fixedly installed on the outer surfaces of the two sides of the steel beam and are close to the upper end. A concrete layer is poured to the outer surface of the upper end of each steel plate. The steel beam is in an I-shape, and the outer surface of the steel beam is movably connected with webs. High-strength bolts are connected to the connection positions between the steel beam and the webs in a threaded manner. Each steel plate is in an L shape, and the splicing joint between each steel plate and the integratedfloor is filled with a foaming agent. The steel beam is fixedly installed in the middle of the keel frame, and the prefabricated stele plates are welded to the steel beam. The treatment technology for the integrated floor ground gap can shorten the construction period, reduce the difficulty of on-site operation, shorten the waiting time in the construction process, and improve the efficiency of construction.
本发明提供了一种集成楼盖地面缝隙处理工艺,包括龙骨架,所述龙骨架的两侧外表面均固定安装有主板,所述龙骨架的上端外表面固定安装有集成楼盖,所述龙骨架的上端外表面的中间位置固定安装有钢梁,所述钢梁的两侧外表面靠近上端的位置固定安装有钢板,所述钢板的上端外表面浇筑有混凝土层,所述钢梁呈工字型,且其外表面活动连接有腹板,所述钢梁与腹板的连接处螺纹连接有高强螺栓,所述钢板呈L型,且其与集成楼盖的拼接处填充有发泡剂,将钢梁固定安装在龙骨架的中间位置将提前制作完成的钢板焊接在钢梁上。本发明,能够缩短施工的工期,降低现场作业的难度,减少了施工工序中的等待,提高施工的效率。
Treatment technology for integrated floor ground gap
The invention provides a treatment technology for an integrated floor ground gap. The treatment technology for the integrated floor ground gap comprises a keel frame. The outer surfaces of the two sides of the keel frame are fixedly provided with main boards. The outer surface of the upper end of the keel frame is fixedly provided with an integrated floor. A steel beam is fixedly installed in themiddle of the outer surface of the upper end of the keel frame. Steel plates are fixedly installed on the outer surfaces of the two sides of the steel beam and are close to the upper end. A concrete layer is poured to the outer surface of the upper end of each steel plate. The steel beam is in an I-shape, and the outer surface of the steel beam is movably connected with webs. High-strength bolts are connected to the connection positions between the steel beam and the webs in a threaded manner. Each steel plate is in an L shape, and the splicing joint between each steel plate and the integratedfloor is filled with a foaming agent. The steel beam is fixedly installed in the middle of the keel frame, and the prefabricated stele plates are welded to the steel beam. The treatment technology for the integrated floor ground gap can shorten the construction period, reduce the difficulty of on-site operation, shorten the waiting time in the construction process, and improve the efficiency of construction.
本发明提供了一种集成楼盖地面缝隙处理工艺,包括龙骨架,所述龙骨架的两侧外表面均固定安装有主板,所述龙骨架的上端外表面固定安装有集成楼盖,所述龙骨架的上端外表面的中间位置固定安装有钢梁,所述钢梁的两侧外表面靠近上端的位置固定安装有钢板,所述钢板的上端外表面浇筑有混凝土层,所述钢梁呈工字型,且其外表面活动连接有腹板,所述钢梁与腹板的连接处螺纹连接有高强螺栓,所述钢板呈L型,且其与集成楼盖的拼接处填充有发泡剂,将钢梁固定安装在龙骨架的中间位置将提前制作完成的钢板焊接在钢梁上。本发明,能够缩短施工的工期,降低现场作业的难度,减少了施工工序中的等待,提高施工的效率。
Treatment technology for integrated floor ground gap
一种集成楼盖地面缝隙处理工艺
WANG JING (Autor:in) / LI LI (Autor:in) / XIAO TIE (Autor:in) / JIANG TIEGANG (Autor:in) / SUN ZHE (Autor:in)
11.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Assembly type ground/floor heating integrated plate structure
Europäisches Patentamt | 2020
|DataCite | 2016
|British Library Online Contents | 1992
|