Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention belongs to the technical field of prefabricated stair construction equipment, and particularly discloses a prefabricated stair temporary supporting device. The prefabricated stair temporary supporting device comprises a moving device arranged at the bottom end of the supporting device, wherein a cross beam device is arranged at the top end of the supporting device and comprises a first cross beam, a second cross beam is sleeved with the first cross beam, the first cross beam is provided with a first fastening screw, the first cross beam and the second cross beam are each providedwith a hoisting device, each hoisting device comprises first sliding grooves, the first sliding grooves are symmetrically formed in the two sides of the first cross beam and the second cross beam, hoisting motors are arranged in the first sliding grooves through first sliding blocks, steel cables are arranged on winding rollers of the hoisting motors, the steel cables are connected with a clamp,and the prefabricated staircase is clamped on a clamp. The supporting device can adapt to construction sites of different installation occasions, the length of the cross beam and the height of the supporting device can be adjusted, the hoisted prefabricated staircase can be finely adjusted in a front-back and left-right moving mode, construction is convenient, and practicability is high.
本发明属于预制楼梯施工设备技术领域,具体公开了一种预制楼梯临时支撑装置,包括移动装置,移动装置设置在支撑装置底端,支撑装置顶端设置有横梁装置,横梁装置包括第一横梁,第二横梁套装在第一横梁中,第一横梁上设置有第一紧固螺丝,第一横梁和第二横梁上均设置有吊装装置,吊装装置包括第一滑槽,第一滑槽对称设置在第一横梁和第二横梁两侧,第一滑槽中通过第一滑块设置有吊装电机,吊装电机的卷收辊上设置有钢索,钢索连接有夹具,预制楼梯夹持在夹具上。本发明能够适应不同安装场合的施工现场,能够调整横梁的长短、支撑装置的高度,且能够对吊装后的预制楼梯进行前后左右移动进行微调,方便施工,实用性强。
The invention belongs to the technical field of prefabricated stair construction equipment, and particularly discloses a prefabricated stair temporary supporting device. The prefabricated stair temporary supporting device comprises a moving device arranged at the bottom end of the supporting device, wherein a cross beam device is arranged at the top end of the supporting device and comprises a first cross beam, a second cross beam is sleeved with the first cross beam, the first cross beam is provided with a first fastening screw, the first cross beam and the second cross beam are each providedwith a hoisting device, each hoisting device comprises first sliding grooves, the first sliding grooves are symmetrically formed in the two sides of the first cross beam and the second cross beam, hoisting motors are arranged in the first sliding grooves through first sliding blocks, steel cables are arranged on winding rollers of the hoisting motors, the steel cables are connected with a clamp,and the prefabricated staircase is clamped on a clamp. The supporting device can adapt to construction sites of different installation occasions, the length of the cross beam and the height of the supporting device can be adjusted, the hoisted prefabricated staircase can be finely adjusted in a front-back and left-right moving mode, construction is convenient, and practicability is high.
本发明属于预制楼梯施工设备技术领域,具体公开了一种预制楼梯临时支撑装置,包括移动装置,移动装置设置在支撑装置底端,支撑装置顶端设置有横梁装置,横梁装置包括第一横梁,第二横梁套装在第一横梁中,第一横梁上设置有第一紧固螺丝,第一横梁和第二横梁上均设置有吊装装置,吊装装置包括第一滑槽,第一滑槽对称设置在第一横梁和第二横梁两侧,第一滑槽中通过第一滑块设置有吊装电机,吊装电机的卷收辊上设置有钢索,钢索连接有夹具,预制楼梯夹持在夹具上。本发明能够适应不同安装场合的施工现场,能够调整横梁的长短、支撑装置的高度,且能够对吊装后的预制楼梯进行前后左右移动进行微调,方便施工,实用性强。
Prefabricated stair temporary supporting device and application construction method thereof
一种预制楼梯临时支撑装置及其应用施工方法
SHEN LU (Autor:in)
11.08.2020
Patent
Elektronische Ressource
Chinesisch
Temporary supporting device for prefabricated stair construction and construction method thereof
Europäisches Patentamt | 2023
|Construction method of detachable prefabricated stair temporary handrail
Europäisches Patentamt | 2024
|