Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tower crane base conversion installation method
The invention discloses a tower crane conversion joint body. The tower crane conversion joint body comprises a lower end connecting part which is connected with a pre-buried fixing piece of a cement base station, a middle connecting part is arranged on the lower end connecting part, and an upper end connecting part arranged at the upper end of the middle connecting part; and the upper end connecting part is connected with a tower crane. The tower crane conversion joint body disclosed by the invention facilitates the connection of the upper end connecting part and the lower end connecting partthrough the middle connecting part so as to facilitate continuous use of the pre-buried fixing piece of the original tower crane base when a new tower crane is mounted without remaking a tower crane base; the original tower crane base is prevented from being removed specially and the new tower crane base is prevented from being remade for mounting the new tower crane; the waste of concrete resource and the production of construction waste are reduced; and flying dust and noise pollution are reduced.
本发明公开了一种塔吊转换接头本体,包括与水泥基台的预埋固定件相连接的下端连接部、设置在所述下端连接部上的中部连接部以及设置在所述中部连接部上端的上端连接部,所述上端连接部用于与塔机相连接。本发明一种塔吊转换接头本体便于通过中部连接部将上端连接部与下端连接部相连接,从而便于安装新塔机时可继续沿用原塔吊基础预埋固定件,无需重新制作一个塔吊基础,避免了专门拆除原有塔机基础和制作新塔机基础用于安装新塔机,减少混凝土资源的浪费及建筑垃圾的产生,降低了扬尘及噪音污染。
Tower crane base conversion installation method
The invention discloses a tower crane conversion joint body. The tower crane conversion joint body comprises a lower end connecting part which is connected with a pre-buried fixing piece of a cement base station, a middle connecting part is arranged on the lower end connecting part, and an upper end connecting part arranged at the upper end of the middle connecting part; and the upper end connecting part is connected with a tower crane. The tower crane conversion joint body disclosed by the invention facilitates the connection of the upper end connecting part and the lower end connecting partthrough the middle connecting part so as to facilitate continuous use of the pre-buried fixing piece of the original tower crane base when a new tower crane is mounted without remaking a tower crane base; the original tower crane base is prevented from being removed specially and the new tower crane base is prevented from being remade for mounting the new tower crane; the waste of concrete resource and the production of construction waste are reduced; and flying dust and noise pollution are reduced.
本发明公开了一种塔吊转换接头本体,包括与水泥基台的预埋固定件相连接的下端连接部、设置在所述下端连接部上的中部连接部以及设置在所述中部连接部上端的上端连接部,所述上端连接部用于与塔机相连接。本发明一种塔吊转换接头本体便于通过中部连接部将上端连接部与下端连接部相连接,从而便于安装新塔机时可继续沿用原塔吊基础预埋固定件,无需重新制作一个塔吊基础,避免了专门拆除原有塔机基础和制作新塔机基础用于安装新塔机,减少混凝土资源的浪费及建筑垃圾的产生,降低了扬尘及噪音污染。
Tower crane base conversion installation method
一种塔吊基础转换安装方法
SONG XUAN (Autor:in) / DONG LIPING (Autor:in) / WANG ZHENGWEN (Autor:in) / LU JUNSHENG (Autor:in) / GAO LUNHAO (Autor:in)
14.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method before installation of tower crane
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|Installation and construction method of underwater tower crane
Europäisches Patentamt | 2023
|Intelligent early warning tower crane installation construction method
Europäisches Patentamt | 2022
|Large-basement baseboard tower-crane installation apparatus
Europäisches Patentamt | 2015
|