Skeleton leveling tile laying construction method
The invention discloses a skeleton leveling ceramic tile laying construction method. The method comprises the following steps that firstly, according to the construction environment and the size of aceramic tile, integral steel square tube keel installation is conducted in the whole area where the ceramic tile needs to be laid, and keels are connected through cross connecting pieces and can be leveled through the cross connecting pieces; secondly, searching the highest point position of the cross point after the keel falls to the ground, taking the highest point position as a horizontal adjustment base point, and adjusting the whole keel to be horizontal on a cross connector of the keel; then, the ceramic tiles are laid on the keels; and finally, light slurry filler is poured into a cavity defined by the keels and the ceramic tiles, and after the slurry is fully poured, pouring is stopped till all the ceramic tiles are laid. The construction method is reasonable in design, simple inlaying, convenient in material transportation, easy to control the construction process and the laying quality, and capable of effectively improving the construction efficiency.
本发明公开了一种骨架调平瓷砖铺设施工方法,包括以下步骤:首先,根据施工环境和瓷砖尺寸,在需要铺设瓷砖的全域面积内,进行整体的钢制方管龙骨安装,龙骨通过交叉连接件连接,并可通过交叉连接件调平;其次,查找龙骨落地后交叉点的最高点位,以此为水平调整基点,在龙骨的交叉连接件上调整整体龙骨水平;然后,将瓷砖铺设在龙骨上;最后,向由龙骨和瓷砖合围形成的空腔内灌入轻体浆填充料,待到浆料灌满后,停止灌注,直至将所有的瓷砖铺设完成。本发明施工方法设计合理,铺设简单,物料运输方便,施工过程和铺设质量易控,有效提高施工效率。
Skeleton leveling tile laying construction method
The invention discloses a skeleton leveling ceramic tile laying construction method. The method comprises the following steps that firstly, according to the construction environment and the size of aceramic tile, integral steel square tube keel installation is conducted in the whole area where the ceramic tile needs to be laid, and keels are connected through cross connecting pieces and can be leveled through the cross connecting pieces; secondly, searching the highest point position of the cross point after the keel falls to the ground, taking the highest point position as a horizontal adjustment base point, and adjusting the whole keel to be horizontal on a cross connector of the keel; then, the ceramic tiles are laid on the keels; and finally, light slurry filler is poured into a cavity defined by the keels and the ceramic tiles, and after the slurry is fully poured, pouring is stopped till all the ceramic tiles are laid. The construction method is reasonable in design, simple inlaying, convenient in material transportation, easy to control the construction process and the laying quality, and capable of effectively improving the construction efficiency.
本发明公开了一种骨架调平瓷砖铺设施工方法,包括以下步骤:首先,根据施工环境和瓷砖尺寸,在需要铺设瓷砖的全域面积内,进行整体的钢制方管龙骨安装,龙骨通过交叉连接件连接,并可通过交叉连接件调平;其次,查找龙骨落地后交叉点的最高点位,以此为水平调整基点,在龙骨的交叉连接件上调整整体龙骨水平;然后,将瓷砖铺设在龙骨上;最后,向由龙骨和瓷砖合围形成的空腔内灌入轻体浆填充料,待到浆料灌满后,停止灌注,直至将所有的瓷砖铺设完成。本发明施工方法设计合理,铺设简单,物料运输方便,施工过程和铺设质量易控,有效提高施工效率。
Skeleton leveling tile laying construction method
一种骨架调平瓷砖铺设施工方法
WANG XINLEI (Autor:in)
14.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Europäisches Patentamt | 2020
|