Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
First-layer concrete pump elbow pipe fixing device
The invention discloses a first-layer concrete pump elbow pipe fixing device. The device comprises a fixing frame and a bottom plate, wherein the fixing frame is located at the top end of the bottom plate, and supporting sleeve rods are symmetrically arranged on the two sides of the top end of the bottom plate; support rods I are arranged in the middle parts of the top ends of the supporting sleeve rods, a plurality of same limiting holes I are formed in the same sides of the support rods I and the supporting sleeve rods, and limiting screw rods I matched with the limiting holes I are arrangedin the limiting holes I in the top ends of the supporting sleeve rods; the top ends of the support rods I are connected with the bottom end of the fixing frame, the fixing frame is in an L shape, oneside of the fixing frame is provided with a supporting plate, and the supporting plate is in an arc shape; one sides of the top end and the bottom end of the fixing frame are provided with grooves, the grooves are in trapezoidal shape, the grooves are internally provided with screw holes and connecting sleeve rods, and one sides of the connecting sleeve rods are connected with the screw holes through fixing screw rods; and the sides, far away from the fixing screw rods, of the connecting sleeve rods are provided with support rods II, the top ends of the support rods II are provided with connecting plates, and lug plates II are symmetrically arranged in the middle parts of the two sides of the connecting plates.
本发明公开了一种首层混凝土泵弯管固定装置,包括固定架和底板,固定架位于底板顶端,底板顶端两侧对称设置有支撑套杆,支撑套杆顶端中部设置有支杆一,支杆一和支撑套杆相同一侧均设置有若干相同的限位孔一,支撑套杆顶端的限位孔一内设置有与限位孔一相适配的限位螺杆一,支杆一顶端连接固定架底端,固定架为L形,固定架一侧设置有支撑板,支撑板为弧形,固定架顶端和底端一侧均设置有凹槽,凹槽为梯形,凹槽内均设置有螺孔,凹槽内均设置有连接套杆,连接套杆一侧通过固定螺杆与螺孔连接,连接套杆一侧且远离固定螺杆一侧设置有支杆二,支杆二顶端设置有连接板,连接板两侧中部对称设置有耳板二。
First-layer concrete pump elbow pipe fixing device
The invention discloses a first-layer concrete pump elbow pipe fixing device. The device comprises a fixing frame and a bottom plate, wherein the fixing frame is located at the top end of the bottom plate, and supporting sleeve rods are symmetrically arranged on the two sides of the top end of the bottom plate; support rods I are arranged in the middle parts of the top ends of the supporting sleeve rods, a plurality of same limiting holes I are formed in the same sides of the support rods I and the supporting sleeve rods, and limiting screw rods I matched with the limiting holes I are arrangedin the limiting holes I in the top ends of the supporting sleeve rods; the top ends of the support rods I are connected with the bottom end of the fixing frame, the fixing frame is in an L shape, oneside of the fixing frame is provided with a supporting plate, and the supporting plate is in an arc shape; one sides of the top end and the bottom end of the fixing frame are provided with grooves, the grooves are in trapezoidal shape, the grooves are internally provided with screw holes and connecting sleeve rods, and one sides of the connecting sleeve rods are connected with the screw holes through fixing screw rods; and the sides, far away from the fixing screw rods, of the connecting sleeve rods are provided with support rods II, the top ends of the support rods II are provided with connecting plates, and lug plates II are symmetrically arranged in the middle parts of the two sides of the connecting plates.
本发明公开了一种首层混凝土泵弯管固定装置,包括固定架和底板,固定架位于底板顶端,底板顶端两侧对称设置有支撑套杆,支撑套杆顶端中部设置有支杆一,支杆一和支撑套杆相同一侧均设置有若干相同的限位孔一,支撑套杆顶端的限位孔一内设置有与限位孔一相适配的限位螺杆一,支杆一顶端连接固定架底端,固定架为L形,固定架一侧设置有支撑板,支撑板为弧形,固定架顶端和底端一侧均设置有凹槽,凹槽为梯形,凹槽内均设置有螺孔,凹槽内均设置有连接套杆,连接套杆一侧通过固定螺杆与螺孔连接,连接套杆一侧且远离固定螺杆一侧设置有支杆二,支杆二顶端设置有连接板,连接板两侧中部对称设置有耳板二。
First-layer concrete pump elbow pipe fixing device
一种首层混凝土泵弯管固定装置
BAI SHUANG (Autor:in)
14.08.2020
Patent
Elektronische Ressource
Chinesisch
Turnover concrete pump pipe vertical elbow fixing device
Europäisches Patentamt | 2021
|Connection elbow pipe of conveying pipe for concrete pump truck
Europäisches Patentamt | 2015
|