Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of foundation pit earthwork conveying and crushing treatment
The invention relates to the technical field of foundation pit earthwork conveying and crushing methods, and discloses a construction method of foundation pit earthwork conveying and crushing treatment. The method comprises the following construction steps that a first horizontal conveying structure is arranged at the pit bottom of a foundation pit, and an earthwork formed through excavation of anexcavator directly falls into the first horizontal conveying structure; the earthwork is conveyed into a feeding hopper of a crusher through the first horizontal conveying structure, the crusher crushes the earthwork, and the earthwork is crushed into soil and stone materials; multiple inclined conveying belts are arranged at the edge of the foundation pit, a discharging hole in the crusher is formed above the inclined conveying belts, the multiple inclined conveying belts are fixedly arranged on the inner side wall of the foundation pit, and the multiple inclined conveying belts are sequentially arranged and extend to the top of the foundation pit; and the soil and stone materials conveyed to the top of the foundation pit through the inclined conveying belts are conveyed to a storage yard through a fourth inclined conveying belt to be stacked in a centralized mode. The method has the advantages of being small in occupied space, not prone to being interfered by a supporting structurein the foundation pit and high in conveying efficiency.
本发明涉及基坑土方运输以及破碎方法的技术领域,公开了一种基坑土方运输及破碎处理的施工方法,包括以下施工步骤:在基坑的坑底布置一道第一水平传输结构,将挖掘机挖掘的土方直接落入第一水平传输结构;土方经第一水平传输结构传送至破碎机的进料斗内,破碎机对土方进行破碎,并将土方破碎为土石料;在基坑的边部设置有多个倾斜传送带,破碎机的出料口设置在倾斜传送带的上方,多个倾斜传送带固定布置在基坑的内侧壁上,多个倾斜传送带依序布置并延伸到基坑的顶部;经倾斜传送带传输至基坑的顶部的土石料,再经第四倾斜传送带传输至堆场集中堆放,具有占用空间小、不易受到基坑内支护结构的干扰、运输效率高的优点。
Construction method of foundation pit earthwork conveying and crushing treatment
The invention relates to the technical field of foundation pit earthwork conveying and crushing methods, and discloses a construction method of foundation pit earthwork conveying and crushing treatment. The method comprises the following construction steps that a first horizontal conveying structure is arranged at the pit bottom of a foundation pit, and an earthwork formed through excavation of anexcavator directly falls into the first horizontal conveying structure; the earthwork is conveyed into a feeding hopper of a crusher through the first horizontal conveying structure, the crusher crushes the earthwork, and the earthwork is crushed into soil and stone materials; multiple inclined conveying belts are arranged at the edge of the foundation pit, a discharging hole in the crusher is formed above the inclined conveying belts, the multiple inclined conveying belts are fixedly arranged on the inner side wall of the foundation pit, and the multiple inclined conveying belts are sequentially arranged and extend to the top of the foundation pit; and the soil and stone materials conveyed to the top of the foundation pit through the inclined conveying belts are conveyed to a storage yard through a fourth inclined conveying belt to be stacked in a centralized mode. The method has the advantages of being small in occupied space, not prone to being interfered by a supporting structurein the foundation pit and high in conveying efficiency.
本发明涉及基坑土方运输以及破碎方法的技术领域,公开了一种基坑土方运输及破碎处理的施工方法,包括以下施工步骤:在基坑的坑底布置一道第一水平传输结构,将挖掘机挖掘的土方直接落入第一水平传输结构;土方经第一水平传输结构传送至破碎机的进料斗内,破碎机对土方进行破碎,并将土方破碎为土石料;在基坑的边部设置有多个倾斜传送带,破碎机的出料口设置在倾斜传送带的上方,多个倾斜传送带固定布置在基坑的内侧壁上,多个倾斜传送带依序布置并延伸到基坑的顶部;经倾斜传送带传输至基坑的顶部的土石料,再经第四倾斜传送带传输至堆场集中堆放,具有占用空间小、不易受到基坑内支护结构的干扰、运输效率高的优点。
Construction method of foundation pit earthwork conveying and crushing treatment
一种基坑土方运输及破碎处理的施工方法
CHEN XIAOHUI (Autor:in) / WANG ZHIQUAN (Autor:in) / LEI BIN (Autor:in) / LI BO (Autor:in) / ZHANG LIXUE (Autor:in) / LIU ZHIJUN (Autor:in) / ZENG JIAMING (Autor:in) / GAO ZIJIAN (Autor:in)
18.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02F
Baggern
,
DREDGING
/
B02C
CRUSHING, PULVERISING, OR DISINTEGRATING IN GENERAL
,
Brechen, Pulverisieren oder Zerkleinern allgemein
/
B65G
TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
,
Transport- oder Lagervorrichtungen, z.B. Förderer zum Laden oder Abladen
CONSTRUCTION METHOD FOR FOUNDATION PIT EARTHWORK TRANSPORTATION AND CRUSHING
Europäisches Patentamt | 2021
|Earthwork construction method for gallery road foundation
Europäisches Patentamt | 2022
|Earthwork crusher with high crushing efficiency and crushing method
Europäisches Patentamt | 2024
|Foundation pit group earthwork construction auxiliary ramp
Europäisches Patentamt | 2023
|