Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Assembled wall body, building and construction process control system of building
The invention provides an assembled wall body, a building and a construction process control system of the building. The solar assembled building wall body comprises a bottom wall body and non-bottomwall bodies which are assembled, wherein the bottom wall body is arranged at the bottom of the wall body, one non-bottom wall body is assembled at the upper part of the bottom wall body, and another non-bottom wall body is assembled at the upper part of the non-bottom wall body, so that the solar assembled building wall body is formed. The invention provides the novel assembled building wall body.Two assembled wall bodies are respectively arranged at the bottom and the non-bottom part. Through the assembly of the assembled wall body, through the arrangement of transparent plates, preheating pipes and other devices, air entering a heat collector can be preheated first, the air conditioning effect is achieved, and the reasonable utilization efficiency of solar energy is improved.
本发明提供了一种装配式墙体、建筑物及其施工过程控制系统,一种太阳能装配式建筑墙体,所述墙体包括底部墙体和非底部墙体装配而成,其中底部墙体设置在墙体底部,底部墙体上部装配非底部墙体,非底部墙体上部装配非底部墙体,从而形成太阳能装配式建筑墙体。本发明中提供了一种新的装配式建筑墙体,装配式墙体设置两种,分别是位于底部和非底部。通过上述装配式墙体的装配,通过设置透明板、预热管等装置,能够使得进入集热器的空气先进行预热,达到空气调节作用,提高了太阳能的利用程度合理利用效率。
Assembled wall body, building and construction process control system of building
The invention provides an assembled wall body, a building and a construction process control system of the building. The solar assembled building wall body comprises a bottom wall body and non-bottomwall bodies which are assembled, wherein the bottom wall body is arranged at the bottom of the wall body, one non-bottom wall body is assembled at the upper part of the bottom wall body, and another non-bottom wall body is assembled at the upper part of the non-bottom wall body, so that the solar assembled building wall body is formed. The invention provides the novel assembled building wall body.Two assembled wall bodies are respectively arranged at the bottom and the non-bottom part. Through the assembly of the assembled wall body, through the arrangement of transparent plates, preheating pipes and other devices, air entering a heat collector can be preheated first, the air conditioning effect is achieved, and the reasonable utilization efficiency of solar energy is improved.
本发明提供了一种装配式墙体、建筑物及其施工过程控制系统,一种太阳能装配式建筑墙体,所述墙体包括底部墙体和非底部墙体装配而成,其中底部墙体设置在墙体底部,底部墙体上部装配非底部墙体,非底部墙体上部装配非底部墙体,从而形成太阳能装配式建筑墙体。本发明中提供了一种新的装配式建筑墙体,装配式墙体设置两种,分别是位于底部和非底部。通过上述装配式墙体的装配,通过设置透明板、预热管等装置,能够使得进入集热器的空气先进行预热,达到空气调节作用,提高了太阳能的利用程度合理利用效率。
Assembled wall body, building and construction process control system of building
一种装配式墙体、建筑物及其施工过程控制系统
WANG SHENG (Autor:in) / ZHANG TONGBO (Autor:in) / LI CUICUI (Autor:in) / FU CHANGCHUN (Autor:in)
18.08.2020
Patent
Elektronische Ressource
Chinesisch
Assembled prefabricated wall for building construction
Europäisches Patentamt | 2020
|Push-pull assembled wall body and assembled building structure
Europäisches Patentamt | 2020
|Prefabricated building assembled wall body positioning device
Europäisches Patentamt | 2021
|