Construction method for removing and centralizing placement of aluminum formworks for external walls
The invention relates to the technical field of material stacking, and discloses a construction method for removing and centralizing placement of aluminum formworks for external walls. The method comprises the following steps that S10, reinforced main ribs are removed, and the reinforced main ribs are hung on a hanger arranged on the lower wall; S20, the aluminum formworks for the external walls are removed, and the aluminum formworks for the external walls are placed on a troughed bracket arranged on the lower wall; S30, a climbing frame climbs up to the construction layer; S40, the aluminumformworks for the external walls are arranged on the construction layer, then, the reinforced main ribs are arranged, and the aluminum formworks for the external walls are reinforced; S50, the hangerand the troughed bracket on the lower wall are removed, the hanger and the troughed bracket are installed on the upper layer of the lower wall, the upper layer of the lower wall forms a new lower wall; S60, concrete pouring is carried out on the aluminum formworks for the external walls to form a new outer wall; and S70, S10-S70 are carried out in cycles until the building construction is completed. According to the technical scheme of the construction method for removing and centralizing placement of aluminum formworks for the external walls, the aluminum formworks for the external walls areprevented from being placed on the climbing frame, and the safety hazards of material placement can be reduced.
本发明涉及材料堆放的技术领域,公开了一种外墙铝模板拆除集中放置的施工方法,包括以下步骤:S10,拆除加固主楞,并将加固主楞挂设在下部墙体所设的挂架上;S20,拆除外墙铝模,并将外墙铝模搁置在下部墙体所设的槽型托架上;S30,爬升架向上爬升至施工层;S40,在施工层安装外墙铝模,然后安装加固主楞,对外墙铝模进行加固;S50,将下部墙体的挂架和槽型托架拆除,并在下部墙体的上一层安装所述挂架和槽型托架,下部墙体的上一层形成新的下部墙体;S60,在外墙铝模内进行混凝土浇筑,形成新的外墙墙体;S70,循环实施S10至S70,直至建筑施工完成。本发明技术方案给出的外墙铝模板拆除集中放置的施工方法,避免外墙铝模放置在爬架上,能够降低材料放置的安全隐患。
Construction method for removing and centralizing placement of aluminum formworks for external walls
The invention relates to the technical field of material stacking, and discloses a construction method for removing and centralizing placement of aluminum formworks for external walls. The method comprises the following steps that S10, reinforced main ribs are removed, and the reinforced main ribs are hung on a hanger arranged on the lower wall; S20, the aluminum formworks for the external walls are removed, and the aluminum formworks for the external walls are placed on a troughed bracket arranged on the lower wall; S30, a climbing frame climbs up to the construction layer; S40, the aluminumformworks for the external walls are arranged on the construction layer, then, the reinforced main ribs are arranged, and the aluminum formworks for the external walls are reinforced; S50, the hangerand the troughed bracket on the lower wall are removed, the hanger and the troughed bracket are installed on the upper layer of the lower wall, the upper layer of the lower wall forms a new lower wall; S60, concrete pouring is carried out on the aluminum formworks for the external walls to form a new outer wall; and S70, S10-S70 are carried out in cycles until the building construction is completed. According to the technical scheme of the construction method for removing and centralizing placement of aluminum formworks for the external walls, the aluminum formworks for the external walls areprevented from being placed on the climbing frame, and the safety hazards of material placement can be reduced.
本发明涉及材料堆放的技术领域,公开了一种外墙铝模板拆除集中放置的施工方法,包括以下步骤:S10,拆除加固主楞,并将加固主楞挂设在下部墙体所设的挂架上;S20,拆除外墙铝模,并将外墙铝模搁置在下部墙体所设的槽型托架上;S30,爬升架向上爬升至施工层;S40,在施工层安装外墙铝模,然后安装加固主楞,对外墙铝模进行加固;S50,将下部墙体的挂架和槽型托架拆除,并在下部墙体的上一层安装所述挂架和槽型托架,下部墙体的上一层形成新的下部墙体;S60,在外墙铝模内进行混凝土浇筑,形成新的外墙墙体;S70,循环实施S10至S70,直至建筑施工完成。本发明技术方案给出的外墙铝模板拆除集中放置的施工方法,避免外墙铝模放置在爬架上,能够降低材料放置的安全隐患。
Construction method for removing and centralizing placement of aluminum formworks for external walls
外墙铝模板拆除集中放置的施工方法
GAO YUTING (Autor:in) / ZHOU JIE (Autor:in) / DUAN KE (Autor:in) / WANG SHENZHOU (Autor:in) / ZHANG LEI (Autor:in) / LIU WEN (Autor:in) / PENG JIASHUAI (Autor:in) / TU XIAOYAN (Autor:in) / ZHANG XIN (Autor:in) / LIU TAO (Autor:in)
18.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Mud-removing polishing equipment for building aluminum formworks
Europäisches Patentamt | 2015
|Construction live loads on slab formworks before concrete placement
Elsevier | 1994
|Construction live loads on slab formworks before concrete placement
British Library Online Contents | 1994
|Construction technology of aluminum alloy formworks for building construction
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|