Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Communication tower installation construction method
The invention relates to a communication tower installation construction method. According to the communication tower installation construction method, the following communication tower installation construction device is adopted, the communication tower installation construction device comprises a locking plate, a lifting plate, an inclined support rod, a leveling frame, a clamping mechanism anda guide branch chain; and the communication tower installation construction method comprises the following steps that S1, a foundation is constructed; S2, a three-pipe tower frame is clamped; S3, thethree-pipe tower frame is lifted; S4, the three-pipe tower frame is installed; and S5, the three-pipe tower frame is stacked and formed. According to the communication tower installation constructionmethod, the problems existing in the installation of an existing three-pipe tower frame that the three-pipe tower frame cannot be firmly locked, the lifting stability of the three-pipe tower frame ispoor, the three-pipe tower frame cannot be in the vertical state during lifting, thus manual auxiliary alignment is needed when the three-pipe tower frame is docked, and the alignment mode of the three-pipe tower frame can cause hidden danger to workers can be solved.
本发明涉及一种通讯塔安装施工方法,该通讯塔安装施工方法采用如下通讯塔安装施工装置,该通讯塔安装施工装置包括锁定板、吊运板、斜支杆、平整架、夹持机构和导向支链;采用上述通讯塔安装施工装置对通讯塔的安装施工方法,包括以下步骤:S1、地基施工;S2、三管塔架夹持;S3、三管塔架吊运;S4、三管塔架安装;S5、三管塔架堆叠成型。本发明可以解决现有三管塔架进行安装时存在的:三管塔架无法进行牢固的锁定,使得三管塔架吊运稳定性差,且三管塔架在吊运时无法处于直立的状态,从而三管塔架进行对接时需要人工辅助对位,三管塔架的这种对位方式会对工人造成安全隐患等问题。
Communication tower installation construction method
The invention relates to a communication tower installation construction method. According to the communication tower installation construction method, the following communication tower installation construction device is adopted, the communication tower installation construction device comprises a locking plate, a lifting plate, an inclined support rod, a leveling frame, a clamping mechanism anda guide branch chain; and the communication tower installation construction method comprises the following steps that S1, a foundation is constructed; S2, a three-pipe tower frame is clamped; S3, thethree-pipe tower frame is lifted; S4, the three-pipe tower frame is installed; and S5, the three-pipe tower frame is stacked and formed. According to the communication tower installation constructionmethod, the problems existing in the installation of an existing three-pipe tower frame that the three-pipe tower frame cannot be firmly locked, the lifting stability of the three-pipe tower frame ispoor, the three-pipe tower frame cannot be in the vertical state during lifting, thus manual auxiliary alignment is needed when the three-pipe tower frame is docked, and the alignment mode of the three-pipe tower frame can cause hidden danger to workers can be solved.
本发明涉及一种通讯塔安装施工方法,该通讯塔安装施工方法采用如下通讯塔安装施工装置,该通讯塔安装施工装置包括锁定板、吊运板、斜支杆、平整架、夹持机构和导向支链;采用上述通讯塔安装施工装置对通讯塔的安装施工方法,包括以下步骤:S1、地基施工;S2、三管塔架夹持;S3、三管塔架吊运;S4、三管塔架安装;S5、三管塔架堆叠成型。本发明可以解决现有三管塔架进行安装时存在的:三管塔架无法进行牢固的锁定,使得三管塔架吊运稳定性差,且三管塔架在吊运时无法处于直立的状态,从而三管塔架进行对接时需要人工辅助对位,三管塔架的这种对位方式会对工人造成安全隐患等问题。
Communication tower installation construction method
一种通讯塔安装施工方法
CHEN XIAOYU (Autor:in) / SUN LIFENG (Autor:in)
18.08.2020
Patent
Elektronische Ressource
Chinesisch
5G communication line tower installation construction method
Europäisches Patentamt | 2024
|Foundation pit construction method of communication iron tower installation foundation
Europäisches Patentamt | 2020
|Construction method before installation of tower crane
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|