Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High-rise building shear wall tube outward-extending wall cap building structure system
The invention relates to the technical field of building walls, in particular to a high-rise building shear wall tube outward-extending wall cap building structure system. The high-rise building shearwall tube outward-extending wall cap building structure system comprises a pile foundation bearing platform, a shear wall tube and a plurality of pile foundation pillars. A plurality of fixing beam bodies are arranged on the outer side of each pile foundation pillar from top to bottom at equal intervals in a sleeving mode. The front ends of one row of the multiple fixing beam bodies are connectedwith a wall cap pouring table, and the bottom face of the wall cap pouring table is connected with a plurality of carrying plates. According to the high-rise building shear wall tube outward-extending wall cap building structure system disclosed by the invention, the multiple uniformly-spaced fixing beam bodies are fixed between the pile foundation pillars and the shear wall tube, the carrying plates are fixed to one sides of the corresponding fixing beam bodies, the front ends of the fixing beam bodies are fixedly connected with the wall cap pouring table through bolts, and the carrying plates are used for ejecting the bottom structure of the wall cap pouring table so that a cement concrete forming wall cap structure can be poured; and construction is convenient, fast and sufficiently accurate, the overall weight of a wall cap is shared by the pile foundation pillars and the shear wall tube together, and the safety of the structure is ensured.
本发明涉及建筑墙体技术领域,具体为一种高层建筑剪力墙筒体外伸墙帽建筑结构体系,包括桩基承台、剪力墙筒体和若干桩基柱,每个桩基柱的外侧从上至下等间距套设有若干固定梁体,其中一排若干固定梁体的前端连接有墙帽浇筑台,墙帽浇筑台的底面连接有若干托板。本发明通过在桩基柱和剪力墙筒体之间固定了若干等间距的固定梁体,固定梁体的一侧固定有托板,固定梁体的前端通过螺栓固定着墙帽浇筑台,通过托板顶着墙帽浇筑台的底部结构,便可浇筑水泥混凝土成型墙帽结构,其施工便捷且准确到位,其墙帽整体的重量通过桩基柱和剪力墙筒体共同分担,保证了结构的安全性。
High-rise building shear wall tube outward-extending wall cap building structure system
The invention relates to the technical field of building walls, in particular to a high-rise building shear wall tube outward-extending wall cap building structure system. The high-rise building shearwall tube outward-extending wall cap building structure system comprises a pile foundation bearing platform, a shear wall tube and a plurality of pile foundation pillars. A plurality of fixing beam bodies are arranged on the outer side of each pile foundation pillar from top to bottom at equal intervals in a sleeving mode. The front ends of one row of the multiple fixing beam bodies are connectedwith a wall cap pouring table, and the bottom face of the wall cap pouring table is connected with a plurality of carrying plates. According to the high-rise building shear wall tube outward-extending wall cap building structure system disclosed by the invention, the multiple uniformly-spaced fixing beam bodies are fixed between the pile foundation pillars and the shear wall tube, the carrying plates are fixed to one sides of the corresponding fixing beam bodies, the front ends of the fixing beam bodies are fixedly connected with the wall cap pouring table through bolts, and the carrying plates are used for ejecting the bottom structure of the wall cap pouring table so that a cement concrete forming wall cap structure can be poured; and construction is convenient, fast and sufficiently accurate, the overall weight of a wall cap is shared by the pile foundation pillars and the shear wall tube together, and the safety of the structure is ensured.
本发明涉及建筑墙体技术领域,具体为一种高层建筑剪力墙筒体外伸墙帽建筑结构体系,包括桩基承台、剪力墙筒体和若干桩基柱,每个桩基柱的外侧从上至下等间距套设有若干固定梁体,其中一排若干固定梁体的前端连接有墙帽浇筑台,墙帽浇筑台的底面连接有若干托板。本发明通过在桩基柱和剪力墙筒体之间固定了若干等间距的固定梁体,固定梁体的一侧固定有托板,固定梁体的前端通过螺栓固定着墙帽浇筑台,通过托板顶着墙帽浇筑台的底部结构,便可浇筑水泥混凝土成型墙帽结构,其施工便捷且准确到位,其墙帽整体的重量通过桩基柱和剪力墙筒体共同分担,保证了结构的安全性。
High-rise building shear wall tube outward-extending wall cap building structure system
一种高层建筑剪力墙筒体外伸墙帽建筑结构体系
XU YAOHAI (Autor:in) / LI CHENGJI (Autor:in)
21.08.2020
Patent
Elektronische Ressource
Chinesisch
High-rise building shear wall cylinder outwards-extending wall cap building structure system
Europäisches Patentamt | 2021
|Design Optimization of Shear Wall High-Rise Building Structures
British Library Conference Proceedings | 2018
|Shear wall structure and fabricated building shear wall structure system
Europäisches Patentamt | 2023
|Outward-extending profile steel full-bolt assembly type shear wall connecting method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|