Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Automatic sand discharging and uniformizing equipment used for building construction and used before floor tile laying
The invention discloses automatic sand discharging and uniformizing equipment used for building construction and used before floor tile laying. The equipment comprises a supporting bottom plate; a first sand storage box and a second sand storage box are arranged on one side of the top end of the supporting bottom plate; a discharging bin is arranged on one side of the bottom end in the second sandstorage box; a discharging propeller is arranged in the discharging bin; a scraping mechanism is arranged on one side of the supporting bottom plate; a contact sensor is arranged on one side of the scraping mechanism; a supplementing opening is formed in one side of the supporting bottom plate; a distance sensor is arranged at the bottom end of one side of the supporting bottom plate; and a vibration scraping plate is arranged on one side of the supporting bottom plate. The equipment has the beneficial effects that sand discharging and uniformizing work can be conducted before floor tile laying, automatic sand discharging can be achieved, the sand discharging speed can be intelligently adjusted, automatic sand supplementing can be conducted on concave positions, sand can be vibrated and flattened after sand supplementing, floor tile laying is facilitated, the structure is reasonable, operation is convenient, the working intensity is effectively reduced, and the working efficiency is improved.
本发明公开了一种建筑施工用地砖铺设前的自动放沙匀沙设备,包括支撑底板,所述支撑底板顶端的一侧设置有储沙箱一和储沙箱二,所述储沙箱二内部底端的一侧设置有排料仓,所述排料仓的内部设置有下料螺旋桨,所述支撑底板的一侧设置有刮料机构,所述刮料机构的一侧设置有接触传感器,所述支撑底板的一侧设置有补料口,所述支撑底板一侧的底端设置有距离传感器,所述支撑底板的一侧设置有震动刮板。有益效果:能够在地砖铺设前进行放沙匀沙工作,能够实现自动放沙,智能调节放沙速度,能够对凹陷位置进行自动补沙,能够在补沙后对沙子进行震动摊平,便于地砖的铺设,结构合理,操作方便,有效降低工作强度、提高工作效率。
Automatic sand discharging and uniformizing equipment used for building construction and used before floor tile laying
The invention discloses automatic sand discharging and uniformizing equipment used for building construction and used before floor tile laying. The equipment comprises a supporting bottom plate; a first sand storage box and a second sand storage box are arranged on one side of the top end of the supporting bottom plate; a discharging bin is arranged on one side of the bottom end in the second sandstorage box; a discharging propeller is arranged in the discharging bin; a scraping mechanism is arranged on one side of the supporting bottom plate; a contact sensor is arranged on one side of the scraping mechanism; a supplementing opening is formed in one side of the supporting bottom plate; a distance sensor is arranged at the bottom end of one side of the supporting bottom plate; and a vibration scraping plate is arranged on one side of the supporting bottom plate. The equipment has the beneficial effects that sand discharging and uniformizing work can be conducted before floor tile laying, automatic sand discharging can be achieved, the sand discharging speed can be intelligently adjusted, automatic sand supplementing can be conducted on concave positions, sand can be vibrated and flattened after sand supplementing, floor tile laying is facilitated, the structure is reasonable, operation is convenient, the working intensity is effectively reduced, and the working efficiency is improved.
本发明公开了一种建筑施工用地砖铺设前的自动放沙匀沙设备,包括支撑底板,所述支撑底板顶端的一侧设置有储沙箱一和储沙箱二,所述储沙箱二内部底端的一侧设置有排料仓,所述排料仓的内部设置有下料螺旋桨,所述支撑底板的一侧设置有刮料机构,所述刮料机构的一侧设置有接触传感器,所述支撑底板的一侧设置有补料口,所述支撑底板一侧的底端设置有距离传感器,所述支撑底板的一侧设置有震动刮板。有益效果:能够在地砖铺设前进行放沙匀沙工作,能够实现自动放沙,智能调节放沙速度,能够对凹陷位置进行自动补沙,能够在补沙后对沙子进行震动摊平,便于地砖的铺设,结构合理,操作方便,有效降低工作强度、提高工作效率。
Automatic sand discharging and uniformizing equipment used for building construction and used before floor tile laying
一种建筑施工用地砖铺设前的自动放沙匀沙设备
LI XIANJIN (Autor:in)
25.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
/
G05B
Steuer- oder Regelsysteme allgemein
,
CONTROL OR REGULATING SYSTEMS IN GENERAL
Sand balancing equipment for building construction before paving floor tile
Europäisches Patentamt | 2016
|Sand uniformizing equipment capable of automatically adjusting sand laying amount
Europäisches Patentamt | 2021
|Sand homogenizing device used before tile paving for building construction
Europäisches Patentamt | 2020
|Building decoration floor tile laying construction method
Europäisches Patentamt | 2023
|