Construction method of steel pipe pile gallery road type green road
The invention discloses a construction method of a steel pipe pile gallery road type green road. The construction method comprises the following steps that S10, a steel pipe pile is sunk; S20, a support is arranged at a pile top of the steel pipe pile; S30, a supporting system is erected on the support; S40, concrete is poured into the steel pipe pile, and a reinforced concrete pile is formed; S50, a formwork is erected on the supporting system, reinforcing steel bars are bound, concrete is poured, and a green road beam plate is formed; and S60, the support, the supporting system and the formwork are dismantled. Problems existing in aspects of construction, use and the like of an existing traditional prefabricated or cast-in-place reinforced concrete pile gallery road can be solved, pile sinking construction is facilitated, and disturbance is smaller.
本发明公开了一种钢管桩栈道型碧道的施工方法,包括以下步骤:S10.将钢管桩沉桩;S20.在所述钢管桩的桩顶设置支架;S30.在所述支架上架设支撑体系;S40.在所述钢管桩中浇筑混凝土,形成钢筋混凝土桩;S50.在所述支撑体系上搭设模板,绑扎钢筋,浇筑混凝土,形成碧道梁板;S60.拆除所述支架、支撑体系和模板。其能够克服目前传统预制或者现浇钢筋混凝土桩栈道在施工及使用等方面存在的问题,便于沉桩施工,扰动更小。
Construction method of steel pipe pile gallery road type green road
The invention discloses a construction method of a steel pipe pile gallery road type green road. The construction method comprises the following steps that S10, a steel pipe pile is sunk; S20, a support is arranged at a pile top of the steel pipe pile; S30, a supporting system is erected on the support; S40, concrete is poured into the steel pipe pile, and a reinforced concrete pile is formed; S50, a formwork is erected on the supporting system, reinforcing steel bars are bound, concrete is poured, and a green road beam plate is formed; and S60, the support, the supporting system and the formwork are dismantled. Problems existing in aspects of construction, use and the like of an existing traditional prefabricated or cast-in-place reinforced concrete pile gallery road can be solved, pile sinking construction is facilitated, and disturbance is smaller.
本发明公开了一种钢管桩栈道型碧道的施工方法,包括以下步骤:S10.将钢管桩沉桩;S20.在所述钢管桩的桩顶设置支架;S30.在所述支架上架设支撑体系;S40.在所述钢管桩中浇筑混凝土,形成钢筋混凝土桩;S50.在所述支撑体系上搭设模板,绑扎钢筋,浇筑混凝土,形成碧道梁板;S60.拆除所述支架、支撑体系和模板。其能够克服目前传统预制或者现浇钢筋混凝土桩栈道在施工及使用等方面存在的问题,便于沉桩施工,扰动更小。
Construction method of steel pipe pile gallery road type green road
一种钢管桩栈道型碧道的施工方法
CAI JIANBO (Autor:in) / YAN RIJIN (Autor:in) / ZHENG FENGYI (Autor:in) / FU CHUANLI (Autor:in) / ZHANG MAOCHENG (Autor:in) / LIU WENHUI (Autor:in)
25.08.2020
Patent
Elektronische Ressource
Chinesisch
Prestressed pipe pile construction method for road foundation
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2018
|