The invention belongs to the technical field of roof construction, and particularly relates to a double-layer metal roof construction process. The double-layer metal roof construction process comprises the following steps that firstly, several points on a panel mounting control line are measured and released through a theodolite, the point position spacing is suitable for mutual intervisibility, then the theodolite is erected on the known control points, and a panel support control line is popped up; and after the control line carries measuring, two recheck lines are used for measuring and setting out, and when panel supports in a straight panel area are constructed, in order to reduce the measurement workload, the control line serves as the reference, and the positions of the panel supports in each row are determined through a special ruler. According to the double-layer metal roof construction process, construction of a 5-8-axis aluminum-magnesium-manganese plate and perforated aluminum plate double-layer metal roof is adopted, thus a 5-8-axis high-span area roof (lobby) and a low-span area roof are perfectly combined, the overall visual effect is obviously improved, and the expected effect is achieved; and through construction of the double-layer metal roof, the related requirements of an FM authentication system are deeply understood by people, valuable experience is accumulated, and a solid foundation is laid for metal roof construction under FM authentication in the future.
本发明属于屋面施工技术领域,尤其为一种双层金属屋面施工工艺,包括如下步骤:首先用经纬仪测放出一条面板安装控制线上的几个点,点位间距以相互能通视为宜,然后将经纬仪架设在已知控制点上,弹出面板支架控制线;控制线测量完后再测放两条复核线,直板区面板支架施工时,为了减少测量工作量,以控制线为基准,用特殊标尺确定每一排面板支架位置;本发明采用5‑‑8轴铝镁锰板、穿孔铝板双层金属屋面的施工,使得5‑8轴高跨区屋面(大堂)与低跨区屋面完美结合,整体视觉效果明显提升,达到了预期的效果,通过双层金属屋面的施工对FM认证体系的相关要求有了深人的了解,积累了宝贵经验,为今后在FM认证下金属屋面施工打下了坚实的基础。
Double-layer metal roof construction process
The invention belongs to the technical field of roof construction, and particularly relates to a double-layer metal roof construction process. The double-layer metal roof construction process comprises the following steps that firstly, several points on a panel mounting control line are measured and released through a theodolite, the point position spacing is suitable for mutual intervisibility, then the theodolite is erected on the known control points, and a panel support control line is popped up; and after the control line carries measuring, two recheck lines are used for measuring and setting out, and when panel supports in a straight panel area are constructed, in order to reduce the measurement workload, the control line serves as the reference, and the positions of the panel supports in each row are determined through a special ruler. According to the double-layer metal roof construction process, construction of a 5-8-axis aluminum-magnesium-manganese plate and perforated aluminum plate double-layer metal roof is adopted, thus a 5-8-axis high-span area roof (lobby) and a low-span area roof are perfectly combined, the overall visual effect is obviously improved, and the expected effect is achieved; and through construction of the double-layer metal roof, the related requirements of an FM authentication system are deeply understood by people, valuable experience is accumulated, and a solid foundation is laid for metal roof construction under FM authentication in the future.
本发明属于屋面施工技术领域,尤其为一种双层金属屋面施工工艺,包括如下步骤:首先用经纬仪测放出一条面板安装控制线上的几个点,点位间距以相互能通视为宜,然后将经纬仪架设在已知控制点上,弹出面板支架控制线;控制线测量完后再测放两条复核线,直板区面板支架施工时,为了减少测量工作量,以控制线为基准,用特殊标尺确定每一排面板支架位置;本发明采用5‑‑8轴铝镁锰板、穿孔铝板双层金属屋面的施工,使得5‑8轴高跨区屋面(大堂)与低跨区屋面完美结合,整体视觉效果明显提升,达到了预期的效果,通过双层金属屋面的施工对FM认证体系的相关要求有了深人的了解,积累了宝贵经验,为今后在FM认证下金属屋面施工打下了坚实的基础。
Double-layer metal roof construction process
一种双层金属屋面施工工艺
WANG XIAOJIE (Autor:in) / XU YI (Autor:in) / LIU SHOUXIANG (Autor:in)
25.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Double-layer metal roof structure and construction method