Building outer wall inner formwork reinforcing method
The invention relates to the field of sectional material building construction methods, in particular to a building outer wall inner formwork reinforcing method. The method can fix an inner formwork and reduce the influence of a cold bridge on wall heat preservation, a building outer wall inner formwork reinforcing method comprises the following steps that an outer formwork and an inner formwork are erected; a pull rope is used for penetrating through the outer formwork and the inner formwork back and forth and alternately penetrates through the outer formwork and the inner formwork multiple times; the pull rope is tensioned by using a pre-tightening piece, so that the outer template and the inner template are pressed and fixed; pouring is carried out on the wall. The stay cord is used forreplacing a split bolt, on the basis that the inner formwork is fixed, a cold bridge perpendicular to a wall can be eliminated by adjusting the angle of the stay cord, the stay cord can be directly left in the wall, and the step of detaching the split bolt is omitted.
本发明涉及型材建筑施工方法领域,尤其涉及一种建筑外墙内模板加固方法,可以实现内模板的固定,并且减少冷桥对墙体保温的影响。一种建筑外墙内模板加固方法,包括以下步骤:支设外模板与内模板;使用拉绳在所述外模板与内模板上来回穿插,多次交替穿过外模板与内模板;使用预紧件拉紧拉绳,使所述外模板与内模板被压紧固定;对墙体进行浇筑。使用拉绳来代替对拉螺栓,在实现内模板固定的基础上,通过调整拉绳的角度可以消除与墙体垂直的冷桥,并且拉绳本身可以直接留在墙体内部,减少拆除对拉螺栓的步骤。
Building outer wall inner formwork reinforcing method
The invention relates to the field of sectional material building construction methods, in particular to a building outer wall inner formwork reinforcing method. The method can fix an inner formwork and reduce the influence of a cold bridge on wall heat preservation, a building outer wall inner formwork reinforcing method comprises the following steps that an outer formwork and an inner formwork are erected; a pull rope is used for penetrating through the outer formwork and the inner formwork back and forth and alternately penetrates through the outer formwork and the inner formwork multiple times; the pull rope is tensioned by using a pre-tightening piece, so that the outer template and the inner template are pressed and fixed; pouring is carried out on the wall. The stay cord is used forreplacing a split bolt, on the basis that the inner formwork is fixed, a cold bridge perpendicular to a wall can be eliminated by adjusting the angle of the stay cord, the stay cord can be directly left in the wall, and the step of detaching the split bolt is omitted.
本发明涉及型材建筑施工方法领域,尤其涉及一种建筑外墙内模板加固方法,可以实现内模板的固定,并且减少冷桥对墙体保温的影响。一种建筑外墙内模板加固方法,包括以下步骤:支设外模板与内模板;使用拉绳在所述外模板与内模板上来回穿插,多次交替穿过外模板与内模板;使用预紧件拉紧拉绳,使所述外模板与内模板被压紧固定;对墙体进行浇筑。使用拉绳来代替对拉螺栓,在实现内模板固定的基础上,通过调整拉绳的角度可以消除与墙体垂直的冷桥,并且拉绳本身可以直接留在墙体内部,减少拆除对拉螺栓的步骤。
Building outer wall inner formwork reinforcing method
一种建筑外墙内模板加固方法
LI ZHANXIAN (Autor:in) / FENG GUOSEN (Autor:in) / DAI XIANQI (Autor:in) / WANG XIAOBO (Autor:in) / WANG WEIWEI (Autor:in) / LI YAN (Autor:in) / LYU SHIHUA (Autor:in) / MENG XIANGLIN (Autor:in) / LIU QIANG (Autor:in)
25.08.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Basement outer wall unilateral formwork reinforcing construction method
Europäisches Patentamt | 2024
|Building all-concrete toilet structure outer wall aluminum formwork reinforcing system
Europäisches Patentamt | 2021
|Building outer floating beam side formwork reinforcing structure
Europäisches Patentamt | 2024
|Building outer floating beam side formwork reinforcing system
Europäisches Patentamt | 2024
|