T-girder flange slab tensioning joint under post-tensioned bonded prestressed ribbed slab and construction method
The invention discloses a T-girder flange slab tensioning joint under a post-tensioned bonded prestressed ribbed slab and a construction method. The construction process flow comprises the following steps of 1) binding of cast-in-place concrete column steel bars and template mounting construction; 2) integral installation of a floor and a T-girder template bracket; 3) girder slab steel bar bindingand prestressed rib pipe insertion pavement; 4) pipe insertion treatment of T-girder flange slab end prestressed ribs under slabs; 5) overall casting and maintenance of slab column concrete; 6) tensioning and anchoring of prestressed ribs at the ends of T-girder flange slabs under the slabs; 7) passageway grouting and prestressed rib anchoring end anchor-sealing treatment; and 8) disassembly of the template bracket. According to the construction method, an under-slab T-girder flange slab end prestressed tensioning technology is adopted at a cast-in-place concrete beam-column joint, so that the beam-column joint stress characteristic is improved effectively; the joint is high in hogging moment resistance; and the prestressed beam-column reinforced joint is high in shock resistance.
本发明公开了一种后张法有粘结预应力筋板下T梁翼板张拉节点及施工方法,其施工工艺流程包括:1)现浇混凝土柱钢筋绑扎及模板安装施工;2)楼板及T梁模板支架整体安装;3)梁板钢筋绑扎及预应力筋穿管铺设;4)板下T梁翼板端头预应力筋穿管处理;5)梁板柱混凝土整体浇筑及养护;6)板下T梁翼板端头预应力筋张拉、锚固;7)孔道灌浆及预应力筋锚固端封锚处理;8)模板支架拆除。本发明在现浇混凝土梁柱节点处采用板下T梁翼板端预应力张拉技术,有效改善了梁柱节点受力特性,节点抗负弯矩效果好,预应力梁柱增强节点抗震能力强。
T-girder flange slab tensioning joint under post-tensioned bonded prestressed ribbed slab and construction method
The invention discloses a T-girder flange slab tensioning joint under a post-tensioned bonded prestressed ribbed slab and a construction method. The construction process flow comprises the following steps of 1) binding of cast-in-place concrete column steel bars and template mounting construction; 2) integral installation of a floor and a T-girder template bracket; 3) girder slab steel bar bindingand prestressed rib pipe insertion pavement; 4) pipe insertion treatment of T-girder flange slab end prestressed ribs under slabs; 5) overall casting and maintenance of slab column concrete; 6) tensioning and anchoring of prestressed ribs at the ends of T-girder flange slabs under the slabs; 7) passageway grouting and prestressed rib anchoring end anchor-sealing treatment; and 8) disassembly of the template bracket. According to the construction method, an under-slab T-girder flange slab end prestressed tensioning technology is adopted at a cast-in-place concrete beam-column joint, so that the beam-column joint stress characteristic is improved effectively; the joint is high in hogging moment resistance; and the prestressed beam-column reinforced joint is high in shock resistance.
本发明公开了一种后张法有粘结预应力筋板下T梁翼板张拉节点及施工方法,其施工工艺流程包括:1)现浇混凝土柱钢筋绑扎及模板安装施工;2)楼板及T梁模板支架整体安装;3)梁板钢筋绑扎及预应力筋穿管铺设;4)板下T梁翼板端头预应力筋穿管处理;5)梁板柱混凝土整体浇筑及养护;6)板下T梁翼板端头预应力筋张拉、锚固;7)孔道灌浆及预应力筋锚固端封锚处理;8)模板支架拆除。本发明在现浇混凝土梁柱节点处采用板下T梁翼板端预应力张拉技术,有效改善了梁柱节点受力特性,节点抗负弯矩效果好,预应力梁柱增强节点抗震能力强。
T-girder flange slab tensioning joint under post-tensioned bonded prestressed ribbed slab and construction method
后张法有粘结预应力筋板下T梁翼板张拉节点及施工方法
ZHANG WEIGUO (Autor:in) / XU ZHUO (Autor:in) / CHEN XUEJUN (Autor:in) / DING WEI (Autor:in) / WANG SIHAI (Autor:in)
01.09.2020
Patent
Elektronische Ressource
Chinesisch
Post-tensioning Girder And Slab Construction Method Using Thereof
Europäisches Patentamt | 2019
|Construction method for super high-rise post-tensioned bonded prestressed beamless floor slab
Europäisches Patentamt | 2021
|Super-long structure post-tensioning bonded prestressed beam and slab integrated construction method
Europäisches Patentamt | 2024
|Construction control method for camber on post-tensioned prestressed beam slab
Europäisches Patentamt | 2023
|Manufacturing method of ribbed prestressed laminated slab
Europäisches Patentamt | 2024
|