Underground pipe gallery construction method based on composite combined type formwork system
The invention discloses an underground pipe gallery construction method based on a composite combined type formwork system. The underground pipe gallery construction method comprises the steps of arranging a composite formwork; dividing pipe gallery construction sections; excavating a pipe gallery foundation pit; constructing a cushion layer, and conducting bottom waterproofness construction; constructing a base plate and a guide wall; removing forms of the base plate and the guide wall; constructing a side wall; constructing a top plate; dismounting a side form and a top form; conducting waterproofness construction; conducting acceptance inspection; and conducting earthwork backfilling. According to the method, an underground pipe gallery is divided into multiple construction areas; eacharea is further divided into multiple line operation sections; each operation section is combined with the composite formwork for gallery body structure line construction operation; the construction site operation difficulty is effectively lowered; the construction quality is guaranteed; the construction forming quality of key portions is guaranteed; the construction efficiency is improved; the construction progress is accelerated; and the comprehensive construction cost is lowered.
本发明公开一种基于复合材料组合式模板体系的综合管廊施工方法,复合模板配模,管廊施工区段划分,管廊基坑开挖,垫层施工及底部防水,底板及导墙施工,底板及导墙拆模,侧墙施工,顶板施工,侧模顶模拆除,防水施工,验收及土方回填。本施工方法将综合管廊分成若干施工区,每个区又分成若干流水作业段,每一作业段都结合复合材料模板进行廊体结构流水施工作业,有效降低施工现场作业难度,保证施工质量,保证了关键部为的施工成型质量,提高了施工效率,加快了施工进度,降低了综合施工造价。
Underground pipe gallery construction method based on composite combined type formwork system
The invention discloses an underground pipe gallery construction method based on a composite combined type formwork system. The underground pipe gallery construction method comprises the steps of arranging a composite formwork; dividing pipe gallery construction sections; excavating a pipe gallery foundation pit; constructing a cushion layer, and conducting bottom waterproofness construction; constructing a base plate and a guide wall; removing forms of the base plate and the guide wall; constructing a side wall; constructing a top plate; dismounting a side form and a top form; conducting waterproofness construction; conducting acceptance inspection; and conducting earthwork backfilling. According to the method, an underground pipe gallery is divided into multiple construction areas; eacharea is further divided into multiple line operation sections; each operation section is combined with the composite formwork for gallery body structure line construction operation; the construction site operation difficulty is effectively lowered; the construction quality is guaranteed; the construction forming quality of key portions is guaranteed; the construction efficiency is improved; the construction progress is accelerated; and the comprehensive construction cost is lowered.
本发明公开一种基于复合材料组合式模板体系的综合管廊施工方法,复合模板配模,管廊施工区段划分,管廊基坑开挖,垫层施工及底部防水,底板及导墙施工,底板及导墙拆模,侧墙施工,顶板施工,侧模顶模拆除,防水施工,验收及土方回填。本施工方法将综合管廊分成若干施工区,每个区又分成若干流水作业段,每一作业段都结合复合材料模板进行廊体结构流水施工作业,有效降低施工现场作业难度,保证施工质量,保证了关键部为的施工成型质量,提高了施工效率,加快了施工进度,降低了综合施工造价。
Underground pipe gallery construction method based on composite combined type formwork system
一种基于复合材料组合式模板体系的综合管廊施工方法
SUN JIANJIE (Autor:in) / LI ZHIPING (Autor:in) / YANG ZHIJUN (Autor:in) / WANG HAIJUN (Autor:in) / LI CHENG (Autor:in)
04.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Auxiliary climbing formwork system for underground pipe gallery construction
Europäisches Patentamt | 2020
Underground comprehensive pipe gallery pouring formwork system
Europäisches Patentamt | 2021
|Underground pipe gallery concrete formwork system and using method thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Comprehensive pipe gallery single-side tool type formwork construction method
Europäisches Patentamt | 2020
|