Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Joint connecting device between curtain wall structure and building body
The invention provides a joint connecting device between a curtain wall structure and a building body. The joint connecting device comprises a first lug plate, a second lug plate, an outer sleeve, aninner sleeve, a guide rod, a first elastic part, a second elastic part and a jacking plate. An opening is formed in one end of the outer sleeve, the first lug plate is fixed to the outer wall of the bottom face of the outer sleeve, and the guide rod is fixed to the inner wall of the bottom face of the outer sleeve. Openings are formed in the two ends of the inner sleeve. The inner sleeve is sleeved with the outer sleeve, and the free end of the guide rod is located in the inner sleeve. The guide rod is provided with a first positioning pre-tightening part and a second positioning pre-tightening part. The first elastic part is arranged between the first positioning pre-tightening part and the end of the inner sleeve, and the second elastic part is arranged between the first positioning pre-tightening part and the second positioning pre-tightening part. One end of the jacking plate is located between the second elastic part and the second positioning pre-tightening part and connected with the second elastic part, and the second lug plate is fixed to the other end of the jacking plate. The joint connecting device can absorb external load energy and release the energy after external loads disappear, and the initial state of a curtain wall is restored.
本发明提供了一种幕墙结构与建筑主体之间的节点连接装置,包括第一耳板、第二耳板、外套筒、内套筒、导向杆、第一弹性件、第二弹性件和顶升板;外套筒一端开口,第一耳板固定在外套筒的筒底面外壁上,导向杆固定在外套筒的筒底面内壁上;内套筒两端开口;外套筒套设在内套筒上,导向杆自由端位于内套筒中;导向杆设置第一定位预紧件和第二定位预紧件;第一定位预紧件与内套筒端部之间设有第一弹性件,第一定位预紧件与第二定位预紧件之间设有第二弹性件;顶升板一端位于第二弹性件与第二定位预紧件之间,并与第二弹性件连接,第二耳板固定在顶升板另一端上。本发明的节点连接装置可吸收外部载荷能量,并在外载荷消失后释放能量,恢复幕墙初始状态。
Joint connecting device between curtain wall structure and building body
The invention provides a joint connecting device between a curtain wall structure and a building body. The joint connecting device comprises a first lug plate, a second lug plate, an outer sleeve, aninner sleeve, a guide rod, a first elastic part, a second elastic part and a jacking plate. An opening is formed in one end of the outer sleeve, the first lug plate is fixed to the outer wall of the bottom face of the outer sleeve, and the guide rod is fixed to the inner wall of the bottom face of the outer sleeve. Openings are formed in the two ends of the inner sleeve. The inner sleeve is sleeved with the outer sleeve, and the free end of the guide rod is located in the inner sleeve. The guide rod is provided with a first positioning pre-tightening part and a second positioning pre-tightening part. The first elastic part is arranged between the first positioning pre-tightening part and the end of the inner sleeve, and the second elastic part is arranged between the first positioning pre-tightening part and the second positioning pre-tightening part. One end of the jacking plate is located between the second elastic part and the second positioning pre-tightening part and connected with the second elastic part, and the second lug plate is fixed to the other end of the jacking plate. The joint connecting device can absorb external load energy and release the energy after external loads disappear, and the initial state of a curtain wall is restored.
本发明提供了一种幕墙结构与建筑主体之间的节点连接装置,包括第一耳板、第二耳板、外套筒、内套筒、导向杆、第一弹性件、第二弹性件和顶升板;外套筒一端开口,第一耳板固定在外套筒的筒底面外壁上,导向杆固定在外套筒的筒底面内壁上;内套筒两端开口;外套筒套设在内套筒上,导向杆自由端位于内套筒中;导向杆设置第一定位预紧件和第二定位预紧件;第一定位预紧件与内套筒端部之间设有第一弹性件,第一定位预紧件与第二定位预紧件之间设有第二弹性件;顶升板一端位于第二弹性件与第二定位预紧件之间,并与第二弹性件连接,第二耳板固定在顶升板另一端上。本发明的节点连接装置可吸收外部载荷能量,并在外载荷消失后释放能量,恢复幕墙初始状态。
Joint connecting device between curtain wall structure and building body
一种幕墙结构与建筑主体之间的节点连接装置
YU AIYAN (Autor:in) / ZHENG XIANGJIE (Autor:in) / ZHOU FENG (Autor:in) / ZHANG YU (Autor:in) / WU XIAOFENG (Autor:in) / GENG SHUAI (Autor:in)
04.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Fabricated building curtain wall connecting structure
Europäisches Patentamt | 2022
|Curtain wall stand column and building main body connecting structure
Europäisches Patentamt | 2020
|Steel structure building curtain wall connecting method
Europäisches Patentamt | 2023
|