Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction device for grit chamber of sewage treatment plant
The invention relates to a construction device for a grit chamber of a sewage treatment plant. The construction device comprises a grit chamber blank, an adjusting and moving unit, a material pastingunit and a fixing unit, wherein the adjusting and moving unit is arranged on the inner wall of the lower end of the grit chamber blank, the material pasting unit is arranged at the left end of the adjusting and moving unit, and the fixing unit is installed on the inner wall of the lower end of the grit chamber blank in a bolt connection mode. According to the construction device, waterproof coiledmaterials are pasted on the grit chamber blanks with different diameters through the same equipment, and the problem that a manual adjusting mode is difficult to ensure that a machine is always pasted on an arc-shaped surface wall surface and moves on the arc-shaped surface wall surface is solved by automatically adjusting the rotating angle of a laying device; and the waterproof coiled materialsare directly laid on the inner wall of the grit chamber blank after hot melting, so that the problems that the coiled materials are easily not tightly pasted on the arc-shaped surface wall surface, and even bubbles exist in the arc-shaped surface wall surface are solved.
本发明涉及一种污水处理厂沉砂池修建施工装置,包括沉沙池坯、调节移动单元、贴料单元和固定单元,所述的沉沙池坯下端内壁上设置有调节移动单元,调节移动单元左端设置有贴料单元,固定单元通过螺栓连接方式安装在沉沙池坯下端内壁上;本发明通过同一个设备对不同直径的沉沙池坯贴设防水卷材,通过自动调节铺设装置的旋转角度,解决了人工调节的方式难以保证机械始终贴和弧形面墙面移动的问题;本发明通过热熔后将防水卷材直接铺设到沉沙池坯内壁上,从而解决了人工在弧形面墙面上铺设卷材容易造成贴和不严密,甚至造成内部有气泡等问题。
Construction device for grit chamber of sewage treatment plant
The invention relates to a construction device for a grit chamber of a sewage treatment plant. The construction device comprises a grit chamber blank, an adjusting and moving unit, a material pastingunit and a fixing unit, wherein the adjusting and moving unit is arranged on the inner wall of the lower end of the grit chamber blank, the material pasting unit is arranged at the left end of the adjusting and moving unit, and the fixing unit is installed on the inner wall of the lower end of the grit chamber blank in a bolt connection mode. According to the construction device, waterproof coiledmaterials are pasted on the grit chamber blanks with different diameters through the same equipment, and the problem that a manual adjusting mode is difficult to ensure that a machine is always pasted on an arc-shaped surface wall surface and moves on the arc-shaped surface wall surface is solved by automatically adjusting the rotating angle of a laying device; and the waterproof coiled materialsare directly laid on the inner wall of the grit chamber blank after hot melting, so that the problems that the coiled materials are easily not tightly pasted on the arc-shaped surface wall surface, and even bubbles exist in the arc-shaped surface wall surface are solved.
本发明涉及一种污水处理厂沉砂池修建施工装置,包括沉沙池坯、调节移动单元、贴料单元和固定单元,所述的沉沙池坯下端内壁上设置有调节移动单元,调节移动单元左端设置有贴料单元,固定单元通过螺栓连接方式安装在沉沙池坯下端内壁上;本发明通过同一个设备对不同直径的沉沙池坯贴设防水卷材,通过自动调节铺设装置的旋转角度,解决了人工调节的方式难以保证机械始终贴和弧形面墙面移动的问题;本发明通过热熔后将防水卷材直接铺设到沉沙池坯内壁上,从而解决了人工在弧形面墙面上铺设卷材容易造成贴和不严密,甚至造成内部有气泡等问题。
Construction device for grit chamber of sewage treatment plant
一种污水处理厂沉砂池修建施工装置
LIU GUO'AN (Autor:in) / JIANG JIAJI (Autor:in) / CHEN YONG (Autor:in) / KONG WEI (Autor:in) / TONG JIAMING (Autor:in) / JING YI (Autor:in)
08.09.2020
Patent
Elektronische Ressource
Chinesisch
Sewage treatment plant grit chamber building construction device
Europäisches Patentamt | 2024
|Sewage treatment plant grit chamber building construction equipment
Europäisches Patentamt | 2023
|Grit chamber model tests for Detroit, Michigan, sewage treatment project
Engineering Index Backfile | 1938
|