Red mud storage yard fill dam protection method and structure
The invention discloses a red mud storage yard fill dam protection method and structure. The method comprises the steps that a layer of HDPE geomembrane is laid on the outer slope surface of a fill dam after the filling of a red mud storage yard fill dam is completed, concrete grids are arranged on the HDPE geomembrane, the concrete grids is filled with soil and stone materials and planting grass,drainage ditches are formed in the dam foot and the dam top of the fill dam, the lower portion of the HDPE geomembrane is connected to the bottoms of the drainage ditches, the upper portion of the HDPE geomembrane is laid below a dam top structural layer to the bottoms of the drainage ditches in the dam top, and the drainage ditches are provided with drainage gradients to drain rainwater on the slope surface of the fill dam out of the dam. According to the method, the protection problem of the outer slope surface and the dam top of the fill dam is thoroughly solved, the outer slope surface and the top of the dam body can be prevented from being washed by rainwater, the rainwater is prevented from being polluted, the effect of protecting the environment is achieved, and good application significance is achieved.
本发明公开了一种赤泥堆场堆积坝的防护方法及其结构,该方法是赤泥堆场堆积坝填筑完成后,先在堆积坝外坡面上铺设一层HDPE土工膜,HDPE土工膜上设置混凝土网格,混凝土网格内填筑土石料、植草,在堆积坝坝脚、坝顶处均设置排水沟,HDPE土工膜下部连接至排水沟沟底,HDPE土工膜上部铺设至坝顶结构层之下直至坝顶排水沟沟底,排水沟设置排水坡度将堆积坝坡面雨水排至坝外。本发明彻底的解决了堆积坝外坡面、坝顶的防护问题,可防止坝体外坡面、顶部被雨水冲刷,防止雨水被污染,亦有保护环境的作用,具有良好的应用意义。
Red mud storage yard fill dam protection method and structure
The invention discloses a red mud storage yard fill dam protection method and structure. The method comprises the steps that a layer of HDPE geomembrane is laid on the outer slope surface of a fill dam after the filling of a red mud storage yard fill dam is completed, concrete grids are arranged on the HDPE geomembrane, the concrete grids is filled with soil and stone materials and planting grass,drainage ditches are formed in the dam foot and the dam top of the fill dam, the lower portion of the HDPE geomembrane is connected to the bottoms of the drainage ditches, the upper portion of the HDPE geomembrane is laid below a dam top structural layer to the bottoms of the drainage ditches in the dam top, and the drainage ditches are provided with drainage gradients to drain rainwater on the slope surface of the fill dam out of the dam. According to the method, the protection problem of the outer slope surface and the dam top of the fill dam is thoroughly solved, the outer slope surface and the top of the dam body can be prevented from being washed by rainwater, the rainwater is prevented from being polluted, the effect of protecting the environment is achieved, and good application significance is achieved.
本发明公开了一种赤泥堆场堆积坝的防护方法及其结构,该方法是赤泥堆场堆积坝填筑完成后,先在堆积坝外坡面上铺设一层HDPE土工膜,HDPE土工膜上设置混凝土网格,混凝土网格内填筑土石料、植草,在堆积坝坝脚、坝顶处均设置排水沟,HDPE土工膜下部连接至排水沟沟底,HDPE土工膜上部铺设至坝顶结构层之下直至坝顶排水沟沟底,排水沟设置排水坡度将堆积坝坡面雨水排至坝外。本发明彻底的解决了堆积坝外坡面、坝顶的防护问题,可防止坝体外坡面、顶部被雨水冲刷,防止雨水被污染,亦有保护环境的作用,具有良好的应用意义。
Red mud storage yard fill dam protection method and structure
一种赤泥堆场堆积坝的防护方法及其结构
WANG SHENG'AN (Autor:in) / LI MINGYANG (Autor:in) / HU YUZHI (Autor:in) / YANG XIAOQUAN (Autor:in) / PAN SHUPEI (Autor:in)
15.09.2020
Patent
Elektronische Ressource
Chinesisch
Soil improvement for a storage yard using the combined vacuum and fill preloading method
Online Contents | 2005
|Soil improvement for a storage yard using the combined vacuum and fill preloading method
British Library Online Contents | 2005
|Europäisches Patentamt | 2025
|