Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Production process and production structure of double-sided prefabricated thermal insulation laminated shear wallboard
The invention discloses a production process and a production structure of a double-sided prefabricated thermal insulation laminated shear wallboard. The production process comprises the following steps that paying off is carried out on a mold table; a side mold is mounted on the mold table; steel bars of the inner wall are bound; truss steel bars or steel reinforcement cages are bound; inner wallconcrete is poured; according to a design drawing of a heat preservation connecting piece, a heat preservation connecting piece preformed hole is drilled in the corresponding position of a heat preservation plate in advance; the heat preservation connecting piece penetrates through the heat preservation connecting piece preformed hole in the heat preservation plate, and the heat preservation connecting piece is sleeved with a supporting plate; before the inner wall concrete is initially set, the heat preservation connecting piece clamped with the heat preservation plate is inserted into the inner wall concrete; and reinforcing steel bars of the outer wall are bound on the heat preservation plate, concrete of the outer wall is poured, and the formwork is removed after outer wall concrete and the inner wall concrete reach the strength, so as to obtain the double-sided prefabricated thermal insulation laminated shear wallboard. The production equipment investment is low, production of the double-sided prefabricated heat preservation laminated shear wallboard can be achieved only on a common production line, and the universality of an assembly line is high.
本发明公开了一种双面预制保温叠合剪力墙板的生产工艺及生产结构,该生产工艺包括以下步骤:在模台上放线;在模台上安装侧模;绑扎内叶墙的钢筋;绑扎桁架钢筋或钢筋笼;浇筑内叶墙混凝土;根据保温连接件的设计图在保温板相应位置上提前钻取保温连接件预留孔;将保温连接件穿过保温板上的保温连接件预留孔,并用托板套入保温连接件;在内叶墙混凝土初凝前,将卡有保温板的保温连接件插入内叶墙混凝土;在保温板上绑扎外叶墙的钢筋,浇筑外叶墙混凝土,待外叶墙混凝土和内叶墙混凝土达到强度后拆模,即可获得双面预制保温叠合剪力墙板。本发明生产设备投入少,仅在普通的生产线就能实现双面预制保温叠合剪力墙板的生产,流水线的通用性强。
Production process and production structure of double-sided prefabricated thermal insulation laminated shear wallboard
The invention discloses a production process and a production structure of a double-sided prefabricated thermal insulation laminated shear wallboard. The production process comprises the following steps that paying off is carried out on a mold table; a side mold is mounted on the mold table; steel bars of the inner wall are bound; truss steel bars or steel reinforcement cages are bound; inner wallconcrete is poured; according to a design drawing of a heat preservation connecting piece, a heat preservation connecting piece preformed hole is drilled in the corresponding position of a heat preservation plate in advance; the heat preservation connecting piece penetrates through the heat preservation connecting piece preformed hole in the heat preservation plate, and the heat preservation connecting piece is sleeved with a supporting plate; before the inner wall concrete is initially set, the heat preservation connecting piece clamped with the heat preservation plate is inserted into the inner wall concrete; and reinforcing steel bars of the outer wall are bound on the heat preservation plate, concrete of the outer wall is poured, and the formwork is removed after outer wall concrete and the inner wall concrete reach the strength, so as to obtain the double-sided prefabricated thermal insulation laminated shear wallboard. The production equipment investment is low, production of the double-sided prefabricated heat preservation laminated shear wallboard can be achieved only on a common production line, and the universality of an assembly line is high.
本发明公开了一种双面预制保温叠合剪力墙板的生产工艺及生产结构,该生产工艺包括以下步骤:在模台上放线;在模台上安装侧模;绑扎内叶墙的钢筋;绑扎桁架钢筋或钢筋笼;浇筑内叶墙混凝土;根据保温连接件的设计图在保温板相应位置上提前钻取保温连接件预留孔;将保温连接件穿过保温板上的保温连接件预留孔,并用托板套入保温连接件;在内叶墙混凝土初凝前,将卡有保温板的保温连接件插入内叶墙混凝土;在保温板上绑扎外叶墙的钢筋,浇筑外叶墙混凝土,待外叶墙混凝土和内叶墙混凝土达到强度后拆模,即可获得双面预制保温叠合剪力墙板。本发明生产设备投入少,仅在普通的生产线就能实现双面预制保温叠合剪力墙板的生产,流水线的通用性强。
Production process and production structure of double-sided prefabricated thermal insulation laminated shear wallboard
一种双面预制保温叠合剪力墙板的生产工艺及生产结构
GU MINGWANG (Autor:in) / WU PING (Autor:in) / HUA FENG (Autor:in) / ZENG LILI (Autor:in) / TANG SHUAI (Autor:in) / LUO JIANPENG (Autor:in) / LIAO SUBO (Autor:in) / CHENG JIAN (Autor:in) / YE YIMING (Autor:in) / MO YANPING (Autor:in)
18.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E04C
STRUCTURAL ELEMENTS
,
Bauelemente
Prefabricated double-sided laminated external composite wallboard system
Europäisches Patentamt | 2023
|DOUBLE-SIDED LAMINATED HEATING WALLBOARD AND PRODUCTION PROCESS THEREFOR
Europäisches Patentamt | 2023
|Lap joint structure of laminated prefabricated shear wallboard
Europäisches Patentamt | 2021
|Integrated production process of prefabricated wallboard and prefabricated wallboard
Europäisches Patentamt | 2024
|