Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reinforced concrete prefabricated assembled shallow foundation pit lock port rapid mounting wall
The invention provides a reinforced concrete prefabricated assembled shallow foundation pit lock port rapid mounting wall. Prefabricated waterproof walls, bases, dewatering devices, fixing devices andreserved wiring devices are included. The multiple prefabricated waterproof walls are connected through the fixing devices in an end-to-end manner. The upper end of each prefabricated waterproof wallis provided with a plurality of installing holes for installing the reserved wiring devices, and the lower end of each prefabricated waterproof wall is provided with the corresponding base, wherein the base is provided with two parallel through grooves, the two through grooves are located in the inner side and the outer side of the corresponding prefabricated waterproof wall, each through grooveis internally provided with one dewatering device, and each dewatering device is formed by a plurality of water discharging grooves connected in an end-to-end manner. The reinforced concrete prefabricated assembled shallow foundation pit lock port rapid mounting wall is prefabricated in a factory before engineering construction, assembling can be rapidly finished in a shallow foundation pit, the construction period is greatly shortened, sealing rubber strips are arranged at the joint positions of the rapid mounting wall, so that it is ensured that connectors are waterproof and are sealed.
本发明提供了一种钢筋混凝土预制装配式浅基坑锁口快装墙,包括预制防水墙、基座、疏水装置、固定装置和预留架线器,若干预制防水墙均通过固定装置首尾相连接,每个预制防水墙上端设有若干用于安装预留架线器的安装孔,下端安装基座,基座上设有相互平行的两个通槽,两个通槽分别位于预制防水墙内外两侧,每个通槽内均安装一个疏水装置,所述疏水装置由若干首尾相连的排水槽构成。本发明所述的一种钢筋混凝土预制装配式浅基坑锁口快装墙,在工程施工前在工厂预制完成,在浅基坑内可以快速完成组装,极大的缩短了工期,且本快装墙通过在接缝处设置封装胶条确保了接口的防水密封。
Reinforced concrete prefabricated assembled shallow foundation pit lock port rapid mounting wall
The invention provides a reinforced concrete prefabricated assembled shallow foundation pit lock port rapid mounting wall. Prefabricated waterproof walls, bases, dewatering devices, fixing devices andreserved wiring devices are included. The multiple prefabricated waterproof walls are connected through the fixing devices in an end-to-end manner. The upper end of each prefabricated waterproof wallis provided with a plurality of installing holes for installing the reserved wiring devices, and the lower end of each prefabricated waterproof wall is provided with the corresponding base, wherein the base is provided with two parallel through grooves, the two through grooves are located in the inner side and the outer side of the corresponding prefabricated waterproof wall, each through grooveis internally provided with one dewatering device, and each dewatering device is formed by a plurality of water discharging grooves connected in an end-to-end manner. The reinforced concrete prefabricated assembled shallow foundation pit lock port rapid mounting wall is prefabricated in a factory before engineering construction, assembling can be rapidly finished in a shallow foundation pit, the construction period is greatly shortened, sealing rubber strips are arranged at the joint positions of the rapid mounting wall, so that it is ensured that connectors are waterproof and are sealed.
本发明提供了一种钢筋混凝土预制装配式浅基坑锁口快装墙,包括预制防水墙、基座、疏水装置、固定装置和预留架线器,若干预制防水墙均通过固定装置首尾相连接,每个预制防水墙上端设有若干用于安装预留架线器的安装孔,下端安装基座,基座上设有相互平行的两个通槽,两个通槽分别位于预制防水墙内外两侧,每个通槽内均安装一个疏水装置,所述疏水装置由若干首尾相连的排水槽构成。本发明所述的一种钢筋混凝土预制装配式浅基坑锁口快装墙,在工程施工前在工厂预制完成,在浅基坑内可以快速完成组装,极大的缩短了工期,且本快装墙通过在接缝处设置封装胶条确保了接口的防水密封。
Reinforced concrete prefabricated assembled shallow foundation pit lock port rapid mounting wall
一种钢筋混凝土预制装配式浅基坑锁口快装墙
WANG JINGSONG (Autor:in) / ZHAO JIE (Autor:in) / LI JIANWEI (Autor:in) / ZHANG GUOQIANG (Autor:in) / CHEN XUE (Autor:in) / WANG ZHEN (Autor:in) / ZOU QUAN (Autor:in) / LI QIAOYA (Autor:in) / WEN JIANJING (Autor:in) / ZHANG ZHOU (Autor:in)
18.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|PREFABRICATED ASSEMBLED REINFORCED CONCRETE RETAINING WALL AND CONSTRUCTION METHOD THEREFOR
Europäisches Patentamt | 2024
|PREFABRICATED CONCRETE RETAINING WALL AND MOUNTING METHOD
Europäisches Patentamt | 2025
|