Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction process of masonry wall
The invention relates to a construction process of a masonry wall. The construction process includes the steps of measuring and laying out, binding structural column and reinforcement cages, masonry solid brick buttresses, setting steel skeletons, erecting height poles, masonry walls, masonry acceptance and wall plastering. By arranging the masonry wall of a three-layer structure, that is, a middle wall formed by pouring concrete on an external wall built by two aerated concrete blocks and an reinforcement cage, based on the reinforcement cage, through connecting assemblies, the connection between the aerated concrete masonry wall and the reinforcement cage is strengthened, so that the lap stability of the masonry wall is improved, the load-bearing capacity of the masonry wall is increased, and cooperating with a reasonable construction sequence and methods, the structural strength of the masonry wall is greatly improved.
本发明涉及一种砌体墙的施工工艺,其包括测量放线、绑扎构造柱钢筋笼、砌筑实心砖坎台、设置钢筋骨架、立设皮数杆、砌筑墙体、砌体验收、墙体抹灰;本发明通过设置三层结构的砌体墙,即两个加气混凝土砌块砌成的外墙和钢筋骨架并浇筑混凝土形成的中墙,以钢筋骨架为基础,通过连接组件加强加气混凝土砌墙与钢筋骨架的连接,从而提高砌体墙的搭接稳定性,并提高砌体墙的承重能力,配合合理施工顺序和方法,大大提高砌体墙的结构强度。
Construction process of masonry wall
The invention relates to a construction process of a masonry wall. The construction process includes the steps of measuring and laying out, binding structural column and reinforcement cages, masonry solid brick buttresses, setting steel skeletons, erecting height poles, masonry walls, masonry acceptance and wall plastering. By arranging the masonry wall of a three-layer structure, that is, a middle wall formed by pouring concrete on an external wall built by two aerated concrete blocks and an reinforcement cage, based on the reinforcement cage, through connecting assemblies, the connection between the aerated concrete masonry wall and the reinforcement cage is strengthened, so that the lap stability of the masonry wall is improved, the load-bearing capacity of the masonry wall is increased, and cooperating with a reasonable construction sequence and methods, the structural strength of the masonry wall is greatly improved.
本发明涉及一种砌体墙的施工工艺,其包括测量放线、绑扎构造柱钢筋笼、砌筑实心砖坎台、设置钢筋骨架、立设皮数杆、砌筑墙体、砌体验收、墙体抹灰;本发明通过设置三层结构的砌体墙,即两个加气混凝土砌块砌成的外墙和钢筋骨架并浇筑混凝土形成的中墙,以钢筋骨架为基础,通过连接组件加强加气混凝土砌墙与钢筋骨架的连接,从而提高砌体墙的搭接稳定性,并提高砌体墙的承重能力,配合合理施工顺序和方法,大大提高砌体墙的结构强度。
Construction process of masonry wall
一种砌体墙的施工工艺
LIU BINGFENG (Autor:in) / LIU XINJIAN (Autor:in) / HU YONGFA (Autor:in) / LIU SHU'E (Autor:in)
18.09.2020
Patent
Elektronische Ressource
Chinesisch
TIBKAT | 2001
|Masonry reinforcing structure, masonry wall and construction method of masonry wall
Europäisches Patentamt | 2023
|Novel anti-cracking wall masonry construction process
Europäisches Patentamt | 2022
|MASONRY RETAINING WALL AND CONSTRUCTION METHOD OF MASONRY RETAINING WALL
Europäisches Patentamt | 2022
|Masonry and painting construction process of adobe wall
Europäisches Patentamt | 2022
|