Half-through arch bridge variable-width section construction method
The invention discloses a half-through arch bridge variable-width section construction method. The method comprises the steps of: hoisting a prefabricated cast-in-place hanging bracket through hoisting equipment to make the top surface of the cast-in-place hanging bracket flush with the bottom surface of a cast section; connecting the two sides of the cast-in-place hanging bracket to two sides ofan arch rib through a hanging tool system correspondingly; laying a template system used for casting a variable-width section on the top face of the cast-in-place hanging bracket, and casting concreteafter steel bars are bound to form the variable-width section; and after the concrete reaches a designed strength, dismounting the hanging tool system, and hoisting the cast-in-place hanging bracketaway through the hoisting equipment. According to the construction method, the cast-in-place hanging bracket is hoisted through hoisting equipment and connected to the cast section, then the cast-in-place hanging bracket and the arch rib are fixedly connected through the hanging tool system, therefore construction of the variable-width section is conducted on the cast-in-place hanging bracket. According to the method, the construction risk in the construction process of the variable-width section is reduced, the operation process is simplified, the construction period is shortened, and the maximization of economy, safety and practicability is realized.
本发明公开了一种中承式拱桥变宽段施工方法,其通过起吊设备起吊预制好的现浇吊架,使现浇吊架的顶面与已浇段的底面齐平;使用吊具系统将现浇吊架的两侧分别连接至拱肋的两侧;在现浇吊架的顶面上铺设用于浇筑变宽段的模板系统,绑扎钢筋后浇筑混凝土以形成变宽段;混凝土达到设计强度后,拆除吊具系统,通过起吊设备吊走现浇吊架。本发明通过起吊设备将现浇吊架吊起并与已浇段相接,再使用吊具系统固定连接现浇吊架与拱肋,从而在现浇吊架上进行变宽段的施工。本发明减小了变宽段施工过程中的施工风险,简化操作流程且缩短施工周期,实现了经济性、安全性和实用性的最大化。
Half-through arch bridge variable-width section construction method
The invention discloses a half-through arch bridge variable-width section construction method. The method comprises the steps of: hoisting a prefabricated cast-in-place hanging bracket through hoisting equipment to make the top surface of the cast-in-place hanging bracket flush with the bottom surface of a cast section; connecting the two sides of the cast-in-place hanging bracket to two sides ofan arch rib through a hanging tool system correspondingly; laying a template system used for casting a variable-width section on the top face of the cast-in-place hanging bracket, and casting concreteafter steel bars are bound to form the variable-width section; and after the concrete reaches a designed strength, dismounting the hanging tool system, and hoisting the cast-in-place hanging bracketaway through the hoisting equipment. According to the construction method, the cast-in-place hanging bracket is hoisted through hoisting equipment and connected to the cast section, then the cast-in-place hanging bracket and the arch rib are fixedly connected through the hanging tool system, therefore construction of the variable-width section is conducted on the cast-in-place hanging bracket. According to the method, the construction risk in the construction process of the variable-width section is reduced, the operation process is simplified, the construction period is shortened, and the maximization of economy, safety and practicability is realized.
本发明公开了一种中承式拱桥变宽段施工方法,其通过起吊设备起吊预制好的现浇吊架,使现浇吊架的顶面与已浇段的底面齐平;使用吊具系统将现浇吊架的两侧分别连接至拱肋的两侧;在现浇吊架的顶面上铺设用于浇筑变宽段的模板系统,绑扎钢筋后浇筑混凝土以形成变宽段;混凝土达到设计强度后,拆除吊具系统,通过起吊设备吊走现浇吊架。本发明通过起吊设备将现浇吊架吊起并与已浇段相接,再使用吊具系统固定连接现浇吊架与拱肋,从而在现浇吊架上进行变宽段的施工。本发明减小了变宽段施工过程中的施工风险,简化操作流程且缩短施工周期,实现了经济性、安全性和实用性的最大化。
Half-through arch bridge variable-width section construction method
一种中承式拱桥变宽段施工方法
ZHOU WEN (Autor:in) / ZHU ZHIGANG (Autor:in) / KE SONGLIN (Autor:in) / YANG JINGXIN (Autor:in) / ZHANG LIJUN (Autor:in) / WANG XUEDONG (Autor:in) / ZHANG YINGHONG (Autor:in) / GUO JUNYA (Autor:in) / HE HUCHENG (Autor:in) / WANG HANG (Autor:in)
22.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Half-through steel arch bridge and construction method
Europäisches Patentamt | 2024
|Half-through arch bridge and construction method thereof
Europäisches Patentamt | 2023
|Construction method of half-through steel tube arch bridge
Europäisches Patentamt | 2023
|Extra-large half-through arch bridge suspender replacement construction method
Europäisches Patentamt | 2020
|Half-through steel arch bridge system and construction and design method
Europäisches Patentamt | 2024
|