Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for connecting 50kg/m steel rail and 80R steel rail
The invention provides a method for connecting a 50kg/m steel rail and an 80R steel rail. The method comprises the following steps that: a special-shaped joint is arranged; the relative positions of the 50kg/m steel rail and the 80R steel rail are adjusted, so that the top surface of the 50kg/m steel rail is flush with the top surface of the 80R steel rail, and the end surface, facing a working edge, of the rail head of the 50kg/m steel rail is flush with the end surface, facing the working edge, of the rail head of the 80R steel rail; and the 50kg/m steel rail is fixedly connected with the 80R steel rail through the special-shaped joint. The invention provides the method for connecting the 50kg/m steel rail and the 80R steel rail; the special-shaped joint is adopted, so that the connection of the 50kg/m steel rail and the 80R steel rail is achieved; and the relative positions of a first connecting section, a transition section and a second connecting section are reasonably arranged, so that the stability and safety during the passage of a train passes can be guaranteed. The method has the advantages of simple connecting mode, convenient operation, and extremely high use value andeconomic value.
本发明供了一种50kg/m钢轨与80R钢轨的连接方法,包括:设置异型接头;调整50kg/m钢轨与80R钢轨的相对位置,使50kg/m钢轨的顶面和80R钢轨的顶面齐平,并使50kg/m钢轨的轨头朝向工作边的端面和80R钢轨的轨头朝向工作边的端面齐平;通过异型接头将50kg/m钢轨与80R钢轨固定连接。本发明所提供的50kg/m钢轨与80R钢轨的连接方法,通过设置异型接头,实现了50kg/m钢轨与80R钢轨的连接,并通过合理设置第一连接段、过渡段和第二连接段的相对位置,能够保障列车通过时的稳定性与安全性,连接方式简单、操作方便,具有极高的使用价值和经济价值。
Method for connecting 50kg/m steel rail and 80R steel rail
The invention provides a method for connecting a 50kg/m steel rail and an 80R steel rail. The method comprises the following steps that: a special-shaped joint is arranged; the relative positions of the 50kg/m steel rail and the 80R steel rail are adjusted, so that the top surface of the 50kg/m steel rail is flush with the top surface of the 80R steel rail, and the end surface, facing a working edge, of the rail head of the 50kg/m steel rail is flush with the end surface, facing the working edge, of the rail head of the 80R steel rail; and the 50kg/m steel rail is fixedly connected with the 80R steel rail through the special-shaped joint. The invention provides the method for connecting the 50kg/m steel rail and the 80R steel rail; the special-shaped joint is adopted, so that the connection of the 50kg/m steel rail and the 80R steel rail is achieved; and the relative positions of a first connecting section, a transition section and a second connecting section are reasonably arranged, so that the stability and safety during the passage of a train passes can be guaranteed. The method has the advantages of simple connecting mode, convenient operation, and extremely high use value andeconomic value.
本发明供了一种50kg/m钢轨与80R钢轨的连接方法,包括:设置异型接头;调整50kg/m钢轨与80R钢轨的相对位置,使50kg/m钢轨的顶面和80R钢轨的顶面齐平,并使50kg/m钢轨的轨头朝向工作边的端面和80R钢轨的轨头朝向工作边的端面齐平;通过异型接头将50kg/m钢轨与80R钢轨固定连接。本发明所提供的50kg/m钢轨与80R钢轨的连接方法,通过设置异型接头,实现了50kg/m钢轨与80R钢轨的连接,并通过合理设置第一连接段、过渡段和第二连接段的相对位置,能够保障列车通过时的稳定性与安全性,连接方式简单、操作方便,具有极高的使用价值和经济价值。
Method for connecting 50kg/m steel rail and 80R steel rail
50kg/m钢轨与80R钢轨的连接方法
LIU HAO (Autor:in) / ZHU HONGZHI (Autor:in)
25.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
Steel rail connecting device and steel rail fixing structure
Europäisches Patentamt | 2022
|Method for connecting 60kg/m steel rail and 80R steel rail
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|