The invention provides a civil engineering foundation water stopping method. The civil engineering foundation water stopping method comprises the following steps that S1, river sludge and sundries areremoved; S2, a hole forming machine is used for punching holes in a stratum, and pile holes are formed; S3, water stopping filler is poured into the pile holes, the water stopping filler is impactedand extruded downwards, and the water stopping filler is extruded into gaps of the stratum; S4, positioning columns are vertically inserted into the water stopping filler, and the upper ends of the positioning columns stretch out of the upper portions of the pile holes; S5, a concrete grout layer is arranged on the surface of the stratum, a clay layer is arranged on the concrete grout layer, and apressure-resistant particle layer is arranged on the clay layer; and S6, an anti-permeation material layer is arranged on the pressure-resistant particle layer, a waterproof blanket layer is arrangedon the anti-permeation material layer, a stone chip layer is arranged on the waterproof blanket layer, and a stone plate layer is laid on the stone chip layer. The civil engineering foundation waterstopping method has a very good anti-permeation effect and is suitable for most soil properties, the positioning columns can go deep into the stratum to form a stable structure, and therefore a very good stable structure is formed for the concrete grout layer, the clay layer and the pressure-resistant particle layer.
一种土木工程地基止水方法,包括以下步骤:S1:清除河道淤泥和杂物;S2:利用成孔机械在地层中打孔,形成桩孔;S3:向桩孔内灌入止水填充料,并向下撞击、挤压止水填充料,止水填充料挤入地层的空隙中;S4:将定位柱竖直插入止水填充料内,定位柱上端伸出桩孔上方;S5:在地层表面设置混凝土浆层,混凝土浆层上设置黏土层,黏土层上设置耐压颗粒层;S6:耐压颗粒层上设置防渗透材料层,防渗透材料层上设置防水毯层;防水毯层上设置石屑层;石屑层上铺设石板层。本发明具有很好的防渗透作用,适合大多数土质,定位柱能够深入地层中,形成稳固结构,从而对混凝土浆层、黏土层和耐压颗粒层形成很好的稳固结构。
Civil engineering foundation water stopping method
The invention provides a civil engineering foundation water stopping method. The civil engineering foundation water stopping method comprises the following steps that S1, river sludge and sundries areremoved; S2, a hole forming machine is used for punching holes in a stratum, and pile holes are formed; S3, water stopping filler is poured into the pile holes, the water stopping filler is impactedand extruded downwards, and the water stopping filler is extruded into gaps of the stratum; S4, positioning columns are vertically inserted into the water stopping filler, and the upper ends of the positioning columns stretch out of the upper portions of the pile holes; S5, a concrete grout layer is arranged on the surface of the stratum, a clay layer is arranged on the concrete grout layer, and apressure-resistant particle layer is arranged on the clay layer; and S6, an anti-permeation material layer is arranged on the pressure-resistant particle layer, a waterproof blanket layer is arrangedon the anti-permeation material layer, a stone chip layer is arranged on the waterproof blanket layer, and a stone plate layer is laid on the stone chip layer. The civil engineering foundation waterstopping method has a very good anti-permeation effect and is suitable for most soil properties, the positioning columns can go deep into the stratum to form a stable structure, and therefore a very good stable structure is formed for the concrete grout layer, the clay layer and the pressure-resistant particle layer.
一种土木工程地基止水方法,包括以下步骤:S1:清除河道淤泥和杂物;S2:利用成孔机械在地层中打孔,形成桩孔;S3:向桩孔内灌入止水填充料,并向下撞击、挤压止水填充料,止水填充料挤入地层的空隙中;S4:将定位柱竖直插入止水填充料内,定位柱上端伸出桩孔上方;S5:在地层表面设置混凝土浆层,混凝土浆层上设置黏土层,黏土层上设置耐压颗粒层;S6:耐压颗粒层上设置防渗透材料层,防渗透材料层上设置防水毯层;防水毯层上设置石屑层;石屑层上铺设石板层。本发明具有很好的防渗透作用,适合大多数土质,定位柱能够深入地层中,形成稳固结构,从而对混凝土浆层、黏土层和耐压颗粒层形成很好的稳固结构。
Civil engineering foundation water stopping method
一种土木工程地基止水方法
CUI ZHENGXU (Autor:in)
25.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation pit supporting water-stopping construction method and water-stopping device thereof
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Foundation pit water stopping and dewatering method and water stopping and dewatering system
Europäisches Patentamt | 2022
|Civil Engineering Research Foundation
British Library Online Contents | 1998