Construction method of integral prefabricated water collecting well
The invention relates to the technical field of building construction, in particular to a construction method of an integral prefabricated water collecting well. The construction method comprises thesteps that S1, the prefabricated water collecting well is manufactured according to the required size; S2, a horizontal positioning line and an elevation control line are snapped according to a main control line of a foundation slab at a lofting pit; S3, the prefabricated water collecting well is hooked, lifted and moved to an installation site; S4, leveling correction is conducted by referring toa horizontal control line of the foundation slab; S5, plain soil is filled to be flush with the upper edge of the prefabricated water collecting well; S6, steel bars above the prefabricated water collecting well are reset and bound with foundation slab steel bars on the two sides; and S7, concrete is poured, a horizontal adjusting frame is disassembled after the concrete on the two sides above the prefabricated water collecting well is completely solidified, and concrete is poured into an opening to block the opening. According to the construction method, the integral prefabricated water collecting well installation construction technology is adopted, and the problems that in a traditional construction method, cracking and leakage are prone to occurring, the earlier stage and the masonryperiod are long, the construction progress is affected by weather, and the site water level is high are solved.
本发明涉及建筑施工技术领域,具体是一种整体式预制集水井的施工方法,包括S1:根据所需尺寸制作预制集水井;S2:根据放样凹坑处基础底板的主控线,弹水平定位线和标高控制线;S3:对预制集水井进行挂钩,提升并移向安装地点;S4:参照底板水平控制线进行调平校正;S5:填入素土,使素土与预制集水上沿平齐;S6:对预制集水井上方钢筋进行复位,并将其与两侧的底板钢筋进行绑扎;S7:浇筑混凝土,待预制集水井上方两侧混凝土完全凝固后将水平调节架拆出,并向开口内灌入混凝土,对开口进行封堵;本发明采用整体式预制集水井安装施工技术,解决了传统施工方法遇到的容易出现开裂渗漏、前期及砌筑周期长,受天气影响施工进度,场地水位高等问题。
Construction method of integral prefabricated water collecting well
The invention relates to the technical field of building construction, in particular to a construction method of an integral prefabricated water collecting well. The construction method comprises thesteps that S1, the prefabricated water collecting well is manufactured according to the required size; S2, a horizontal positioning line and an elevation control line are snapped according to a main control line of a foundation slab at a lofting pit; S3, the prefabricated water collecting well is hooked, lifted and moved to an installation site; S4, leveling correction is conducted by referring toa horizontal control line of the foundation slab; S5, plain soil is filled to be flush with the upper edge of the prefabricated water collecting well; S6, steel bars above the prefabricated water collecting well are reset and bound with foundation slab steel bars on the two sides; and S7, concrete is poured, a horizontal adjusting frame is disassembled after the concrete on the two sides above the prefabricated water collecting well is completely solidified, and concrete is poured into an opening to block the opening. According to the construction method, the integral prefabricated water collecting well installation construction technology is adopted, and the problems that in a traditional construction method, cracking and leakage are prone to occurring, the earlier stage and the masonryperiod are long, the construction progress is affected by weather, and the site water level is high are solved.
本发明涉及建筑施工技术领域,具体是一种整体式预制集水井的施工方法,包括S1:根据所需尺寸制作预制集水井;S2:根据放样凹坑处基础底板的主控线,弹水平定位线和标高控制线;S3:对预制集水井进行挂钩,提升并移向安装地点;S4:参照底板水平控制线进行调平校正;S5:填入素土,使素土与预制集水上沿平齐;S6:对预制集水井上方钢筋进行复位,并将其与两侧的底板钢筋进行绑扎;S7:浇筑混凝土,待预制集水井上方两侧混凝土完全凝固后将水平调节架拆出,并向开口内灌入混凝土,对开口进行封堵;本发明采用整体式预制集水井安装施工技术,解决了传统施工方法遇到的容易出现开裂渗漏、前期及砌筑周期长,受天气影响施工进度,场地水位高等问题。
Construction method of integral prefabricated water collecting well
一种整体式预制集水井的施工方法
HE QIANGLONG (Autor:in) / PENG ZHENFENG (Autor:in) / WANG SONGMING (Autor:in) / YANG XIANJUN (Autor:in) / LIU JINCHENG (Autor:in)
25.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
/
B28B
Formgeben von Ton oder anderen keramischen Stoffzusammensetzungen, Schlacke oder von Mischungen, die zementartiges Material enthalten, z.B. Putzmörtel
,
SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS, SLAG OR MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
/
E02D
FOUNDATIONS
,
Gründungen
Prefabricated water-collecting well structure and construction method
Europäisches Patentamt | 2022
|Prefabricated water collecting well and construction and manufacturing method thereof
Europäisches Patentamt | 2022
|Prefabricated water collecting culvert inspection well
Europäisches Patentamt | 2021
|Prefabricated water collecting side ditch and construction method
Europäisches Patentamt | 2024
|