Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method for reinforcing confined space high fill roadbed slope foam concrete
The invention discloses a construction method for reinforcing confined space high fill roadbed slope foam concrete. The construction method includes the steps that a concrete pavement of a to-be-reinforced part is broken, earth fill without slope protection measures at the upper part of a retaining wall is dug out through an excavator, high fill severe in water and soil loss is excavated in layers, a five-to-seven-stage cut slope excavation platform is arranged on a roadbed with a reserved pavement, Larsen steel plate piles are inserted between the cut slope excavation platform and the reserved pavement, a formwork on the outer side of the foam concrete is a disassembly-free formwork, a foam concrete roadbed is poured, and finally a concrete pavement is poured. By means of the constructionmethod, the problem that due to the water and soil loss of a confined space high fill roadbed slope, the roadbed retaining wall settles and horizontally moves to a great degree and vehicles cannot run is solved.
本发明公开了受限空间高填方路基边坡泡沫混凝土加固的施工方法,该施工方法包括破除准备加固部分的混凝土路面,用挖掘机挖去挡土墙上部无做护坡措施的填土,将受水土流失严重的高填方分层开挖,靠近保留路面的路基设置五至七级的放坡开挖平台,该放坡开挖平台与保留路面之间插打拉森钢板桩,泡沫混凝土外侧的支模为免拆模板,浇筑泡沫混凝土路基,最后浇筑混凝土路面,通过本发明的施工方法解决了受限空间高填方路基边坡水土流失,导致路基挡土墙出现很大程度的沉降和水平位移,车辆无法行驶的难题。
Construction method for reinforcing confined space high fill roadbed slope foam concrete
The invention discloses a construction method for reinforcing confined space high fill roadbed slope foam concrete. The construction method includes the steps that a concrete pavement of a to-be-reinforced part is broken, earth fill without slope protection measures at the upper part of a retaining wall is dug out through an excavator, high fill severe in water and soil loss is excavated in layers, a five-to-seven-stage cut slope excavation platform is arranged on a roadbed with a reserved pavement, Larsen steel plate piles are inserted between the cut slope excavation platform and the reserved pavement, a formwork on the outer side of the foam concrete is a disassembly-free formwork, a foam concrete roadbed is poured, and finally a concrete pavement is poured. By means of the constructionmethod, the problem that due to the water and soil loss of a confined space high fill roadbed slope, the roadbed retaining wall settles and horizontally moves to a great degree and vehicles cannot run is solved.
本发明公开了受限空间高填方路基边坡泡沫混凝土加固的施工方法,该施工方法包括破除准备加固部分的混凝土路面,用挖掘机挖去挡土墙上部无做护坡措施的填土,将受水土流失严重的高填方分层开挖,靠近保留路面的路基设置五至七级的放坡开挖平台,该放坡开挖平台与保留路面之间插打拉森钢板桩,泡沫混凝土外侧的支模为免拆模板,浇筑泡沫混凝土路基,最后浇筑混凝土路面,通过本发明的施工方法解决了受限空间高填方路基边坡水土流失,导致路基挡土墙出现很大程度的沉降和水平位移,车辆无法行驶的难题。
Construction method for reinforcing confined space high fill roadbed slope foam concrete
受限空间高填方路基边坡泡沫混凝土加固的施工方法
LI HUIYING (Autor:in) / ZENG JIA (Autor:in) / LI ZHINONG (Autor:in) / LI MING (Autor:in) / TANG JINGZHAO (Autor:in) / HUANG YUE (Autor:in) / CHEN LIANG (Autor:in) / SU WU (Autor:in) / HUANG MIAOJIN (Autor:in) / CHEN ZHONG (Autor:in)
29.09.2020
Patent
Elektronische Ressource
Chinesisch
Construction method of high-fill steep fitting slope roadbed
Europäisches Patentamt | 2023
|High-fill steep fitting slope roadbed and construction method thereof
Europäisches Patentamt | 2024
|