Railway mechanical sleeper replacement construction method based on sleeper replacement machine
The invention discloses a railway machinery sleeper replacement construction method based on a sleeper replacement machine. The railway machinery sleeper replacement construction method comprises thesteps that 1, dismounting fasteners; 2, reserving a sleeper replacement working surface; 3, drawing old sleepers out; 4, installing new sleepers; 5, installing fasteners; 6, carrying out railway ballast preliminary filling; and 7, moving the sleeper replacement machine forwards by the distance of one sleeper, and repeating the step 3 to step 6 till the old sleepers needing to be replaced are replaced. The invention further discloses a sleeper replacing device which comprises a sleeper replacing machine body, a railway ballast digging shovel, sleeper clamps and a connecting part. The sleeper replacing device further comprises an adjusting mechanism capable of adjusting the relative positions or angles of the sleeper clamps. The operation mode that the sleeper replacement machine is matchedwith manual construction is adopted, the mechanization degree is high, compared with a traditional pure manual sleeper replacement construction method, the operation efficiency is high, sleeper replacement and ballast raking are completed mechanically, labor input is reduced, the labor intensity is lowered, and the operation efficiency is improved.
本发明公开了一种基于换枕机的铁路机械抽换轨枕施工方法,其包括步骤一、拆除扣件;步骤二、预留换枕作业面;步骤三、抽出旧轨枕;步骤四、安装新轨枕;步骤五、安装扣件;步骤六、初填道砟;步骤七、换枕机向前移动一根轨枕的距离,重复步骤三至步骤六直至换完需要更换的旧轨。本发明还公开了一种换枕装置,其包括换枕机车身、道砟挖铲、轨枕夹钳和连接部;换枕装置还包括能够调整轨枕夹钳相对位置或角度的调节机构。本发明采用换枕机配合人工施工的作业模式,机械化程度高,相比较传统的纯人工抽换轨枕施工方法,作业效率高,抽换枕及扒砟,都采用机械完成,减少了劳动力投入,降低了劳动强度,提高了作业工效。
Railway mechanical sleeper replacement construction method based on sleeper replacement machine
The invention discloses a railway machinery sleeper replacement construction method based on a sleeper replacement machine. The railway machinery sleeper replacement construction method comprises thesteps that 1, dismounting fasteners; 2, reserving a sleeper replacement working surface; 3, drawing old sleepers out; 4, installing new sleepers; 5, installing fasteners; 6, carrying out railway ballast preliminary filling; and 7, moving the sleeper replacement machine forwards by the distance of one sleeper, and repeating the step 3 to step 6 till the old sleepers needing to be replaced are replaced. The invention further discloses a sleeper replacing device which comprises a sleeper replacing machine body, a railway ballast digging shovel, sleeper clamps and a connecting part. The sleeper replacing device further comprises an adjusting mechanism capable of adjusting the relative positions or angles of the sleeper clamps. The operation mode that the sleeper replacement machine is matchedwith manual construction is adopted, the mechanization degree is high, compared with a traditional pure manual sleeper replacement construction method, the operation efficiency is high, sleeper replacement and ballast raking are completed mechanically, labor input is reduced, the labor intensity is lowered, and the operation efficiency is improved.
本发明公开了一种基于换枕机的铁路机械抽换轨枕施工方法,其包括步骤一、拆除扣件;步骤二、预留换枕作业面;步骤三、抽出旧轨枕;步骤四、安装新轨枕;步骤五、安装扣件;步骤六、初填道砟;步骤七、换枕机向前移动一根轨枕的距离,重复步骤三至步骤六直至换完需要更换的旧轨。本发明还公开了一种换枕装置,其包括换枕机车身、道砟挖铲、轨枕夹钳和连接部;换枕装置还包括能够调整轨枕夹钳相对位置或角度的调节机构。本发明采用换枕机配合人工施工的作业模式,机械化程度高,相比较传统的纯人工抽换轨枕施工方法,作业效率高,抽换枕及扒砟,都采用机械完成,减少了劳动力投入,降低了劳动强度,提高了作业工效。
Railway mechanical sleeper replacement construction method based on sleeper replacement machine
一种基于换枕机的铁路机械抽换轨枕施工方法
WANG XIAOFENG (Autor:in) / WANG HAIYAN (Autor:in) / MA LEYI (Autor:in) / CAO DEZHI (Autor:in) / TIAN WEIPING (Autor:in) / ZHAO JIE (Autor:in) / LIU XIAOGAO (Autor:in) / YAN JINGRUN (Autor:in)
02.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01B
PERMANENT WAY
,
Gleisoberbau
REPLACEMENT CONCRETE SLEEPER CONSTRUCTION METHOD AND REPLACEMENT CONCRETE SLEEPER
Europäisches Patentamt | 2018
|