Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Environment-friendly construction method for expressway
The invention provides an environment-friendly construction method for an expressway. The method comprises the steps that 1 a drainage ditch is dug, and a first drainage pipe is placed in the drainageditch; the first drainage pipe comprises a first pipe and a second pipe; the first pipe is connected with a first water tank and a spraying pipe; 2 a drainage layer is laid and communicates with a second drainage pipe, the second drainage pipe communicates with a second pipe, and the second pipe communicates with the first water tank; 3 a filter layer and a steel wire mesh are laid; 4 a protective net is laid; and 5 in the construction period of the non-rainfall period, an automatic dust falling system starts. The environment-friendly construction method is simple and labor-saving, solves theproblem of water collection of a construction section, effectively saves water resources by utilizing waste water to filter, spray and reduce dust, and is excellent in dust reduction effect.
本发明公开了一种高速公路环保施工方法,包括以下步骤:步骤一、挖设排水沟,排水沟内安放第一排水管;第一排水管包括第一管和第二管,第一管连接第一水箱和喷淋管;步骤二、铺设排水层,排水层连通第二排水管,第二排水管与第二管连通,第二管连通至第一水箱;步骤三、铺设过滤层和钢丝网;步骤四、铺设防护网;步骤五、在非降雨时段的施工期间内,开启自动降尘系统。本发明环保施工方法简单省力,解决施工段集水问题的同时,利用废水过滤喷淋降尘,有效节约水资源,降尘效果极佳。
Environment-friendly construction method for expressway
The invention provides an environment-friendly construction method for an expressway. The method comprises the steps that 1 a drainage ditch is dug, and a first drainage pipe is placed in the drainageditch; the first drainage pipe comprises a first pipe and a second pipe; the first pipe is connected with a first water tank and a spraying pipe; 2 a drainage layer is laid and communicates with a second drainage pipe, the second drainage pipe communicates with a second pipe, and the second pipe communicates with the first water tank; 3 a filter layer and a steel wire mesh are laid; 4 a protective net is laid; and 5 in the construction period of the non-rainfall period, an automatic dust falling system starts. The environment-friendly construction method is simple and labor-saving, solves theproblem of water collection of a construction section, effectively saves water resources by utilizing waste water to filter, spray and reduce dust, and is excellent in dust reduction effect.
本发明公开了一种高速公路环保施工方法,包括以下步骤:步骤一、挖设排水沟,排水沟内安放第一排水管;第一排水管包括第一管和第二管,第一管连接第一水箱和喷淋管;步骤二、铺设排水层,排水层连通第二排水管,第二排水管与第二管连通,第二管连通至第一水箱;步骤三、铺设过滤层和钢丝网;步骤四、铺设防护网;步骤五、在非降雨时段的施工期间内,开启自动降尘系统。本发明环保施工方法简单省力,解决施工段集水问题的同时,利用废水过滤喷淋降尘,有效节约水资源,降尘效果极佳。
Environment-friendly construction method for expressway
高速公路环保施工方法
ZHU ZHAOMING (Autor:in) / JI XUAN (Autor:in) / WANG BO (Autor:in) / PEI YUANYUAN (Autor:in) / MA JUNLIANG (Autor:in) / LIU XUEJUN (Autor:in) / YAN XIANGDONG (Autor:in) / GAO FENG (Autor:in) / TAO WUTING (Autor:in) / DUAN LILI (Autor:in)
09.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
B01D
SEPARATION
,
Trennen
/
E01H
STREET CLEANING
,
Reinigen von Straßen
/
E03F
SEWERS
,
Abwasserkanäle
/
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
/
G01N
Untersuchen oder Analysieren von Stoffen durch Bestimmen ihrer chemischen oder physikalischen Eigenschaften
,
INVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
Wastewater environment-friendly treatment device for expressway construction
Europäisches Patentamt | 2021
|Environment-friendly greening isolation frame for expressway
Europäisches Patentamt | 2024
|Energy-saving and environment-friendly expressway sound barrier
Europäisches Patentamt | 2024
|Energy-saving and environment-friendly expressway sound insulation barrier
Europäisches Patentamt | 2020
|