Hanging construction method for hanging movable electric hoist on main body structure beam plates by full reverse construction method
The invention discloses a hanging construction method for hanging a movable electric hoist on main body structure beam plates by a full reverse construction method. The method comprises the followingsteps of: (1) the side span of a main body structure is provided with a hanging article soil outlet, and construction preparation is carried out; (2) tracks are laid on the three layers of main body structure beam plates and extend out of the outdoor and the electric hoist and an electric system are mounted; (4) pre-test inspection is carried out; (5) commission acceptance is carried out; and (6)hanging construction is carried out. The hanging construction method for hanging the movable electric hoist on the main body structure beam plates by the full reverse construction method can effectively solve the problem of vertical transportation in the hanging construction of the reverse construction method, can accelerate the construction speed, shorten the construction period, has obvious social benefits and economic benefits, and has popularization value.
全逆作法主体结构梁板悬挂移动式电动葫芦吊物施工方法,包括以下步骤:(1)主体结构边跨设置吊物出土口,施工准备;(2)轨道敷设在三层主体结构梁板上,并外伸出室外;(3)电动葫芦及电气系统安装;(4)试验前检查;(5)试运验收;(6)吊物施工。本发明全逆作法主体结构梁板悬挂移动式电动葫芦吊物施工方法能有效解决在逆作法吊物施工中垂直运输问题,能加快施工速度,缩短工期,社会效益和经济效益明显,具有推广价值。
Hanging construction method for hanging movable electric hoist on main body structure beam plates by full reverse construction method
The invention discloses a hanging construction method for hanging a movable electric hoist on main body structure beam plates by a full reverse construction method. The method comprises the followingsteps of: (1) the side span of a main body structure is provided with a hanging article soil outlet, and construction preparation is carried out; (2) tracks are laid on the three layers of main body structure beam plates and extend out of the outdoor and the electric hoist and an electric system are mounted; (4) pre-test inspection is carried out; (5) commission acceptance is carried out; and (6)hanging construction is carried out. The hanging construction method for hanging the movable electric hoist on the main body structure beam plates by the full reverse construction method can effectively solve the problem of vertical transportation in the hanging construction of the reverse construction method, can accelerate the construction speed, shorten the construction period, has obvious social benefits and economic benefits, and has popularization value.
全逆作法主体结构梁板悬挂移动式电动葫芦吊物施工方法,包括以下步骤:(1)主体结构边跨设置吊物出土口,施工准备;(2)轨道敷设在三层主体结构梁板上,并外伸出室外;(3)电动葫芦及电气系统安装;(4)试验前检查;(5)试运验收;(6)吊物施工。本发明全逆作法主体结构梁板悬挂移动式电动葫芦吊物施工方法能有效解决在逆作法吊物施工中垂直运输问题,能加快施工速度,缩短工期,社会效益和经济效益明显,具有推广价值。
Hanging construction method for hanging movable electric hoist on main body structure beam plates by full reverse construction method
全逆作法主体结构梁板悬挂移动式电动葫芦吊物施工方法
CHEN WEICHAO (Autor:in) / CHEN HAO (Autor:in) / GAO GANGYAO (Autor:in) / ZHOU JIANFA (Autor:in) / ZHANG MINGLIANG (Autor:in) / WANG JIANGYING (Autor:in) / GAO BO (Autor:in)
20.10.2020
Patent
Elektronische Ressource
Chinesisch
Movable hanging basket for bridge construction and hanging basket control method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Hanging structure for concrete beam and construction method of hanging structure
Europäisches Patentamt | 2020
|