Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
The invention relates to a water conservancy bridge structure. The structure comprises two opposite bridgehead side walls, abutment caps arranged on the bridgehead side walls and a plurality of groupsof pier columns vertically buried between the two bridgehead side walls, and further comprises base layer base plates arranged on the pier columns and close to the top ends, bent caps fixedly connected with the top ends of the pier columns, damping supports fixedly connected with the top surfaces of the bent caps, ear walls symmetrically arranged on two sides of the bent caps, supporting beams vertically connected with the ear walls, a bridge deck lapping plate fixedly connected with the bent caps through the damping supports, waterproof bridgehead lapping plates with the two sides in the length direction being connected with the abutment caps and the bent caps respectively, expansion joints with the two sides being fixedly connected with the bridge deck lapping plate and the waterproof bridgehead lapping plates respectively, automatic regulators arranged on the abutment caps, and anti-collision barrels and guardrails which are arranged on the pier columns in a sleeving mode. The defects of poor safety and durability of a water conservancy bridge in the prior art are overcome, and the structure has the advantage that the safety and durability of the water conservancy bridge are improved.
本申请涉及一种水利桥梁结构,其包括两个相对设置的桥头侧墙、设在桥头侧墙上的台帽和多组竖直埋设位于两个所述桥头侧墙之间位置的墩柱,还包括设在墩柱上靠近其顶端的基层垫板、与墩柱顶端固定连接的盖梁、与盖梁的顶面固定连接的阻尼支座、对称设在盖梁两侧的耳墙、与耳墙垂直连接的支撑梁、通过阻尼支座与盖梁固定连接的桥面搭板、沿长度方向的两侧分别与台帽和盖梁连接的防水桥头搭板、两侧分别与桥面搭板和防水桥头搭板固定连接的伸缩缝、设在台帽上的自动调节器和套在墩柱上的防撞筒体以及护栏。本申请解决了相关技术中的水利桥梁存在安全性和耐久性差的缺陷,具有使水利桥梁的安全性和耐久性得到改善的优点。
The invention relates to a water conservancy bridge structure. The structure comprises two opposite bridgehead side walls, abutment caps arranged on the bridgehead side walls and a plurality of groupsof pier columns vertically buried between the two bridgehead side walls, and further comprises base layer base plates arranged on the pier columns and close to the top ends, bent caps fixedly connected with the top ends of the pier columns, damping supports fixedly connected with the top surfaces of the bent caps, ear walls symmetrically arranged on two sides of the bent caps, supporting beams vertically connected with the ear walls, a bridge deck lapping plate fixedly connected with the bent caps through the damping supports, waterproof bridgehead lapping plates with the two sides in the length direction being connected with the abutment caps and the bent caps respectively, expansion joints with the two sides being fixedly connected with the bridge deck lapping plate and the waterproof bridgehead lapping plates respectively, automatic regulators arranged on the abutment caps, and anti-collision barrels and guardrails which are arranged on the pier columns in a sleeving mode. The defects of poor safety and durability of a water conservancy bridge in the prior art are overcome, and the structure has the advantage that the safety and durability of the water conservancy bridge are improved.
本申请涉及一种水利桥梁结构,其包括两个相对设置的桥头侧墙、设在桥头侧墙上的台帽和多组竖直埋设位于两个所述桥头侧墙之间位置的墩柱,还包括设在墩柱上靠近其顶端的基层垫板、与墩柱顶端固定连接的盖梁、与盖梁的顶面固定连接的阻尼支座、对称设在盖梁两侧的耳墙、与耳墙垂直连接的支撑梁、通过阻尼支座与盖梁固定连接的桥面搭板、沿长度方向的两侧分别与台帽和盖梁连接的防水桥头搭板、两侧分别与桥面搭板和防水桥头搭板固定连接的伸缩缝、设在台帽上的自动调节器和套在墩柱上的防撞筒体以及护栏。本申请解决了相关技术中的水利桥梁存在安全性和耐久性差的缺陷,具有使水利桥梁的安全性和耐久性得到改善的优点。
Water conservancy bridge structure
一种水利桥梁结构
WANG GANGQING (Autor:in)
20.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Temporarily-built bridge plate structure for water conservancy project
Europäisches Patentamt | 2022
|Bridge end transition slab structure for water conservancy project
Europäisches Patentamt | 2023
|Water conservancy rapid floating bridge building method
Europäisches Patentamt | 2023
|