Construction method used in initial stage of sinking of sinking well
The invention relates to a construction method used in an initial stage of sinking of a sinking well. The construction method comprises the following steps: a sinking well sinking area and an easy-to-flush area are determined on a riverbed, the easy-to-flush area is located at the upstream of the sinking well sinking area, and at least part of the easy-to-flush area is overlapped with the sinkingwell sinking area; the easy-to-flush area is riprapped with a protective layer; the sinking well sinks in the sinking well sinking area to enable the sinking well to sit on the bed for the first time;and the protective layer at the bottom of the sinking well is removed to enable the sinking well to sink to the preset elevation according to a preset posture, and final bed sitting is completed. Theproblem that in a related technology, the sinking well sinks to form a large elevation difference, and consequently the sinking well is deviated can be solved.
本申请涉及一种用于沉井下沉初期的施工方法,其包括如下步骤:在河床上确定沉井下沉区域和易冲刷区域,其中,所述易冲刷区域位于沉井下沉区域上游,且易冲刷区域至少部分与沉井下沉区域重叠;在所述易冲刷区域内抛填防护层;在所述沉井下沉区域内下沉沉井,以使所述沉井初次着床;移除所述沉井底部的防护层,以使所述沉井按照预设姿态下沉至预设高程,完成最终着床。本申请能解决相关技术中沉井下沉形成较大高差,导致沉井偏位的问题。
Construction method used in initial stage of sinking of sinking well
The invention relates to a construction method used in an initial stage of sinking of a sinking well. The construction method comprises the following steps: a sinking well sinking area and an easy-to-flush area are determined on a riverbed, the easy-to-flush area is located at the upstream of the sinking well sinking area, and at least part of the easy-to-flush area is overlapped with the sinkingwell sinking area; the easy-to-flush area is riprapped with a protective layer; the sinking well sinks in the sinking well sinking area to enable the sinking well to sit on the bed for the first time;and the protective layer at the bottom of the sinking well is removed to enable the sinking well to sink to the preset elevation according to a preset posture, and final bed sitting is completed. Theproblem that in a related technology, the sinking well sinks to form a large elevation difference, and consequently the sinking well is deviated can be solved.
本申请涉及一种用于沉井下沉初期的施工方法,其包括如下步骤:在河床上确定沉井下沉区域和易冲刷区域,其中,所述易冲刷区域位于沉井下沉区域上游,且易冲刷区域至少部分与沉井下沉区域重叠;在所述易冲刷区域内抛填防护层;在所述沉井下沉区域内下沉沉井,以使所述沉井初次着床;移除所述沉井底部的防护层,以使所述沉井按照预设姿态下沉至预设高程,完成最终着床。本申请能解决相关技术中沉井下沉形成较大高差,导致沉井偏位的问题。
Construction method used in initial stage of sinking of sinking well
一种用于沉井下沉初期的施工方法
CHEN TAO (Autor:in) / LI JUNTANG (Autor:in) / YANG HAO (Autor:in) / PAN DONGFA (Autor:in) / TU MANMING (Autor:in) / MAO WEIQI (Autor:in) / SHU HAIHUA (Autor:in) / ZHANG GENG (Autor:in) / ZHA DAOHONG (Autor:in) / LUO BING (Autor:in)
20.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of well sinking cover plate structure and well sinking cover plate structure
Europäisches Patentamt | 2024
|Airbag-assisted underwater sinking pipe rotary sinking construction method
Europäisches Patentamt | 2024
|Open well sinking device, open well structure and open well sinking method
Europäisches Patentamt | 2023
|Well sinking in Gowtami bridge construction
Engineering Index Backfile | 1965
|